Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 11, 2011 FBO #3366
MODIFICATION

J -- T-AOE USNS ARCTIC MAINTENANCE AND REPAIR UPGRADE (MARUP)

Notice Date
2/9/2011
 
Notice Type
Modification/Amendment
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
Department of the Navy, Military Sealift Command, MSC HQ - Washington, 914 Charles Morris Court, SE, Washington Navy Yard, Washington, District of Columbia, 20398-5540
 
ZIP Code
20398-5540
 
Solicitation Number
N1024-11-0001
 
Archive Date
3/10/2011
 
Point of Contact
Reyn C Schuttler, Phone: 202-685-5945
 
E-Mail Address
reyn.schuttler@navy.mil
(reyn.schuttler@navy.mil)
 
Small Business Set-Aside
N/A
 
Description
N1024-11-0001 February 8, 2010 From: COMSC N1024 Subject: Market Survey for the T-AOE USNS ARCTIC MAINTENANCE AND REPAIR UPGRADE (MARUP) Enclosure (1) NAVSEA DWG 8287176 Rev - This is a request for information only and your response is not an offer. This is not a solicitation or request for quotes and no contract or purchase order will be awarded from this notice. There is no solicitation, specifications or drawings, other than the Heavy Underway Replenishment (UNREP) Testing Guidance at Enclosure (1), available at this time. BACKGROUND/APPROACH The Military Sealift Command (MSC) operates four (4) T-AOE 6 Class ships with a primary mission of providing fast logistical support to the US Navy's fleet. The Military Sealift Command will operate the USNS ARCTIC (T-AOE 8) on a routine scheduled Dry-Dock period. The geographic area of consideration is the US East Coast or Gulf of Mexico. Beginning on/about 11 January 2012, MSC will put the T-AOE 8 into a Regular Overhaul and Dry-docking with a period of performance of approximately 270 days to install a new machinery controls system, habitability modifications (Habmods), heavy UNREP installation, dry-docking, normal maintenance & repair items, and alterations. The machinery control system is being installed as Government Furnished Equipment (GFE) and will be the main focus of the availability alterations. Another large set of alterations are the habmod requirements. The installation of a fully functional prototype Heavy UNREP System for Station No. 6 and backbone equipment for Station 12 (not functional) are also major alterations. The alterations are to enhance operational and control characteristics and consolidate disparate monitoring systems. The ship particulars are as follows: USNS ARCTIC (T-AOE-8) Length Overall - 753 FT. - 8 ½ IN Max Beam - 107 FT. - 0 IN Full Load Displacement -53,000 LT Enclosure 1 NAVSEA DWG 8287176 Rev - (Heavy UNREP Testing Guidance) While the finalized list of work items is still under development, a list of the notional work package items is as follows: Watertight Door Repair Lube Oil Unloader Valve Repair Gas Turbine Filter House Repair and Preservation LO Temp Regulating Valve Overhaul Shore Power Monitoring & Safety Mods SWBD Fuse Replacement Switchoard 1S, 1SA, & 1SB Bus Tie Auto Closure Removal RCC Vane Status Monitoring & Safety Mods Steering Local Control RCC Fill & Drain Valves Reefer Plant Monitoring HPAC Controller Replacement Refrigeration Plant Monitoring System Overhaul bleed air regulator valves Install Shipwide Fire Detection System Install JP 5 helo refueling fuel meter Valve Repair Boiler Inspection Renew Sea Water Pipe Overhaul Distillate Pump and Motor Overhaul Condensate Pump and Motor Overhaul Brine Pump and Motor Overhaul Feed Pump and Motor Cargo Reefer Compressor Repair Central Seawater Pump and Motor Repair AC Seawter Pump and Motor Repair Fuel Oil Stripping Pump and Motor Repair Repair JP-5 Stripping Piping Install MARPOL Fuel Drip Sampling Capability JP-5 Recirculation Piping Modification No. 2 JP-5 Pump and Motor Overhaul Cargo Fuel Oil Pump and Motor Overhaul Misc Leslie Valve Repair Fire Pump and Motor Overhaul Recondition No. 3 Elevator Hoist Motor Replace Sewage Piping Deck Compressor Installation Install Fire Dampers in Halon Spaces Annual Fire Fighting Certification SCBA Certification J Door Refurbishment Accommodation Ladder IMO Certification Replace Deck Covering Main Deck and Above AC Plant Refurbish Clean Ventilation System Ducting Replace vent Duct Insulation Install Independent Cooling Systems in Various Spaces Repair Cooling Coils Overhaul Vane Axial Fans and Motors Repair Steam Heating Coils Rip Out Existing Medical Spaces and Install 11 New SR and 2 T&S Spaces Refurbish and Rearrange all Crew Open Berthing Spaces- A total of 130 single high racks, 260 lockers, 130 desks, and Refurbishment of a total of 6 T&S Spaces Dry-Dock and Undock Ship Rudder Survey Stern Bearing Survey Sea Valve Overhauls Underwater Blast and Coat Clean and Polish Propellers Zinc Renewal Anchor and Chain Steel Renewal Blast and Coat Tanks Intermediate Hull Survey and UT Testing Main Propulsion Shaft Survey Oily Waste and Waste Oil Tank Preservation ABS Quadrennial Inspection HP Air Relive Valve Calibration Station No. 2 Spanwire Winch Main Electric motor bearings Upgrade Remaining 4 Hauling Winches to IC Drums/Farin Shoes Accomplish Solo Cable Upgrade on Legacy Stations Refurbish Station 11 Sliding Pad Eye Replace all Ram Tensioner Accumulator Floating Piston Seals HRAS Station No. 6 Installation HRAS Station No. 12 Installation Backbone Questions for Industry: Please prepare a capabilities statement to address the foregoing and at a minimum the items enumerated below: (1) Is the shipyard's dry-dock currently NAVSEA certified? If not, what certification does it currently hold? Has it ever been NAVSEA certified in the past? (2) This availability is currently anticipated to have a period of performance of approximately 270 beginning on/about 12 January 2012. The dry-docking will be restricted to the first 60 days of the availability. Is your dry-dock available in this timeframe? Do you have the capacity to manage this size availability given other workload anticipated for this same timeframe? (3) The machinery control system will be replaced during this availability by a Government Contractor. The shipyard will be responsible for removing the existing control consoles and supporting GFE installation. The time frame to accomplish this removal is within the first 60 days of the overhaul. What if any experience does the shipyard have with this type of work with imposed time frames of this sort? (4) A large alteration in this package is the installation of a new Heavy UNREP system for Station 6 which will be a fully functional prototype. The Station 12 Heavy UNREP requirements are a "backbone" of equipment which will have to be modified in the future to become functional. The Heavy Unrep alterations will require removal of machinery and installation of foundations and equipment while the ship is on dock to support installation and testing schedules. Also, significant pier testing will be required once the installation is completed by the shipyard. How has your shipyard tested new UNREP systems in the past? Can your facilities accommodate the stretch testing required for completion of this work? A guide to testing is provided as Enclosure (1). (5) This procurement will be solicited under NAICS 336611, Ship Building and Repair. Please indicate your business size status for this NAICS. Is your company a large or small business, and if a small business, do you fall within any of the further classifications (Hubzone, SDVOSB, WOSB, etc.) Please provide your response to this Request for Information by COB 23 February 2011. Submissions should be made by email to Reyn.Schuttler@Navy.Mil. MSC has limitations on file sizes, so if the attached files are larger than a total of 3M, please submit via separate emails. Submission of a capabilities statement is not a prerequisite to any potential future offerings, but participation will assist the Government as to the extent of shipyards available for this procurement. The Government is not obligated to and will not pay for any information received from potential sources as a result of this notice.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/MSC/MSCHQ/N1024-11-0001 /listing.html)
 
Record
SN02376862-W 20110211/110209234751-0cc52fdd7cb835c8f1290e1e4bc6e332 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.