Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 11, 2011 FBO #3366
SOLICITATION NOTICE

K -- Improved Altitude Hold and Hover Stabilization (IAHHS) modification in support of the HH-60 helicopter

Notice Date
2/9/2011
 
Notice Type
Presolicitation
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, WR-ALC, WR-ALC/PK Acquisition Opportunities, 235 Byron St,, Warner Robins, Georgia, 31098-1611, United States
 
ZIP Code
31098-1611
 
Solicitation Number
FA8552-11-R-30301
 
Archive Date
4/8/2011
 
Point of Contact
Celeste M Denham, Phone: (478)926-7272, William (Bill) V Walton, Phone: (478)926-7525
 
E-Mail Address
Celeste.Denham@robins.af.mil, william.walton@robins.af.mil
(Celeste.Denham@robins.af.mil, william.walton@robins.af.mil)
 
Small Business Set-Aside
N/A
 
Description
This is a sole source requirement for the Improved Altitude Hold and Hover Stabilization (IAHHS) modification in support of the HH-60 Helicopter. This effort includes the following: 0001: Non-Recurring Engineering (NRE) (1 LO) - Delivery: 4 months ARO; 0002: Trial Installation Kit (1 EA) - Delivery: 5 months ARO; 0003: Contractor Flight Test Support (1 LO) - Delivery: 5 months ARO; 0004: Kit Proof Kit - Group A (1 EA) - Delivery: 2 months after successful flight tests; 0005: Kit Proof Kit - Group B (1 EA) - Delivery: 2 months after successful flight tests; 0006: Kit Proof Kit Installation - Group B (1 LO) - Delivery: 2 months after successful flight tests; 0007: Data (1 LO) - Delivery: IAW DD Form 1423; 0008: Interim Contractor Support (ICS) (1 LO) - Delivery: As required; 0009: Travel and Per Diem (1 LO) - Delivery: As required; 0010: Developmental Engineering Model Group B Kits (2 EA) - Delivery: 6 months after successful flight tests; 0011: Production Kits - Group A (98 EA) - Delivery: (A rate of 6 ea per month) 6 months after successful flight tests; 0012: Production Kits - Group B (98 EA) - Delivery: (A rate of 6 ea per month) 6 months after successful flight tests; 0013: Simulator Kits - Group B (2 EA) - Delivery: 6 months after successful flight tests; 0014: Initial Spares - Group B (10 EA) - Delivery: 6 months after successful flight tests; Firm fixed price contract to Cage Code 0CDN3, DRS Intelligence Avionic Solution Inc., 4391 Dayton-Xenia Road, Dayton, OH 45432-1803. Authority: 10 U.S.C. 2304(c)(1) as implemented by FAR 6.302-1, only one or a limited number of responsible sources, and no other supplies or services will satisfy agency requirements. A complete data package is not available to the government. Electronic procedures will be used for this solicitation; request a solicitation from http://www.fedbizopps.gov/. Approximate issue date of solicitation is 23 February 2011. All potential offerors should contact the buyer, Celeste M. Denham at 478-926-7272, for additional information and/or to communicate concerns, if any, concerning this acquisition.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/WRALC/FA8552-11-R-30301/listing.html)
 
Place of Performance
Address: 4391 Dayton-Xenia Road, Dayton, Ohio, 45432, United States
Zip Code: 45432
 
Record
SN02376671-W 20110211/110209234614-95a2abc4e9563a6ae47b37b65b64c9c4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.