FBO DAILY ISSUE OF OCTOBER 08, 2010 FBO #3240
AWARD

Y -- Vallecito Spillway Bridge

Notice Date
10/6/2010
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-2 Rocky Mountain Region, 740 Simms Street, Regional Office, Golden, Colorado, 80401
 
ZIP Code
80401
 
Solicitation Number
AG-82X9-S-10-0102
 
Archive Date
10/9/2010
 
Point of Contact
David H. Johnson,
 
E-Mail Address
davidhjohnson@fs.fed.us
(davidhjohnson@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Award Number
AG-82X9-C-10-0185
 
Award Date
9/24/2010
 
Awardee
JE Hurley, 4602 Northpark Dr, Colorado Springs, Colorado 80918, United States
 
Award Amount
$1,396,748.00
 
Line Number
Base Only
 
Description
Scope of Work: The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: Road work: • Establish the traffic control signing and barricades at County Road 501 as required. • Coordinate work with affected utility companies. • Perform preliminary grading. • Construct the culverts at Jack Creek and at the future fire station. • Construct embankment and subgrade. • Construct asphalt pavement. • Install permanent traffic control (signing and striping). • Install new fences and gate. • Seeding and final site work. Bridge work: • Excavate for abutments and drilled shafts. • Install the drilled shafts while monitoring vibration at the existing spillway walls. • Construct the abutment beam seats and portions of the wingwalls as shown on the plans. • Construct the temporary pier and footing. • Erect the steel girders. • Place the concrete deck and end diaphragms. • Construct the remaining portions of abutments and wingwalls. • Remove the temporary pier after the deck has reached its design strength. The temporary footing may remain in place. • Install lean concrete backfill. • Construct the approach slabs. • Construct the bridge rails. • Construct the fences on the bridge. • Install the swale and the finish grading at the bridge. Project Location: The project is located approximately 22 miles east of Durango, Colorado at the Vallecito Reservoir in the San Juan National Forest. The work is on a new section of Forest Service Road # 603.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/82X9/Awards/AG-82X9-C-10-0185.html)
 
Record
SN02307399-W 20101008/101006234628-94f3d8a83ade63702dc01ff66ad55de0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)