Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 02, 2010 FBO #3234
AWARD

42 -- RECOVERY--42--PROJECT NUMBER 111253, REPLACE C02 SYSTEM AT BARKLEY POWERPLANT

Notice Date
9/30/2010
 
Notice Type
Award Notice
 
NAICS
561621 — Security Systems Services (except Locksmiths)
 
Contracting Office
USACE District, Nashville, P.O. Box 1070, 801 Broad Street, Nashville, TN 37202-1070
 
ZIP Code
37202-1070
 
Solicitation Number
W912P5-RFQ372030
 
Archive Date
10/30/2010
 
Point of Contact
Ray Kendrick, 615-736-7932
 
E-Mail Address
USACE District, Nashville
(ray.kendrick@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912P5-09-F-0032 P00006
 
Award Date
9/29/2010
 
Awardee
SIMPLEXGRINNELL LP (063732408)<br> 2005 ELM HILL PIKE<br> NASHVILLE, TN 37210-3807
 
Award Amount
$35,895.69
 
Line Number
0002
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: 03FAC The Contractor shall remove a portion of the inch supply line to Unit No. 1 and Unit No. 4 and replace it with inch piping to address the difference in pipe sizes to the new system. The Contract shall add expansion loops in the existing two inch piping to Unit No. 1 to adjust for the length in the run. He shall remove the existing supply from the Oil Storage Room No. 1 and No.2, from the Oil Treatment Room, and paint the grease room where the replaced pipe has been removed. The Contractor shall run a remote fill line from the tank to an accessible location for filling. The Contractor shall run pressure relief lines from the tank to outdoors. Additional painting for the expansion loops, fill lines and pressure relief lines shall be conducted to restore all interior walls in the plant to existing conditions where the Contractors work has caused disturbance or damage. The Contractor shall conduct all necessary core drilling of the exterior walls for the fill lines and pressure relief lines. The Contractors price adjustment shall be payment for all material, labor, supplies, design, painting and core drilling.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA62/Awards/W912P5-09-F-0032 P00006.html)
 
Record
SN02303818-W 20101002/101001000244-67f1bb10611f1062d11524ebe8d3d6d5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.