Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 30, 2010 FBO #3232
AWARD

Y -- Kissimmee River Restoration Project, CSX Railroad Bridge, Okeechobee and Highlands Counties, Florida

Notice Date
9/28/2010
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
W912EP-10-R-0028
 
Response Due
7/26/2010
 
Archive Date
3/1/2011
 
Point of Contact
Pamela Shirley, 904-232-1992
 
E-Mail Address
USACE District, Jacksonville
(pamela.j.shirley@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-10-C-0025
 
Award Date
9/28/2010
 
Awardee
LANE CONSTRUCTION CORPORATION, THE (006917504)<br> 90 FIELDSTONE CT<br> CHESHIRE, CT 06410-1212
 
Award Amount
$6,842,233.00
 
Line Number
0001-0017
 
Description
The CSX Railroad Bridge in Highlands and Okeechobee Counties, Florida is part of the Kissimmee River Restoration Project (KRR). The work includes the following: construction of a new bridge to carry the CSX Railroad across a restored section of the Kissimmee River, and incidental related work. The new bridge is to be on the existing mainline railroad alignment. It is necessary to build a temporary detour railroad section with its centerline 75 feet north of the mainline centerline that will be removed after the bridge is complete. Work includes: Erosion and sediment control measures; demolition of remnant portions of a previous bridge; clearing and grubbing; earthwork; building a temporary track detour; building permanent track; channel excavation; riprap; and grassing. Approximately 9,000 CY of soil removal contains creosote residue and shall be tested and disposed of in an appropriate disposal site. The following is included in the bridge construction: Piling (foundations and fender system support); substructure; superstructure; and fender system. Coordination with the CSX Railroad for removal of existing track-work, installation of temporary track-work, installation of new track-work, and relocation of CSX signal cable will also be required. The project also includes Construction of a limestone/shell aggregate maintenance road parallel to portions of the north and south sides of the CSX right of way and installation of a new fence. All material to perform the temporary and permanent track-work (over Sub-ballast) will be furnished by the government. CSX will perform all necessary connections to the temporary track and permanent track installed by contractor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/W912EP-10-R-0028/listing.html)
 
Record
SN02299156-W 20100930/100928234704-10171e9c5cbb90f788828731c17a414a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.