FBO DAILY ISSUE OF SEPTEMBER 29, 2010 FBO #3231
AWARD

Y -- The Cottages Phase I Construction 679-309

Notice Date
9/27/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs;Tuscaloosa VA Medical Center;3701 Loop Road East;Tuscaloosa AL 35404-5088
 
ZIP Code
35404-5088
 
Solicitation Number
VA24710IB0062
 
Response Due
8/20/2010
 
Archive Date
11/26/2010
 
Point of Contact
Wanda Goolsby
 
E-Mail Address
ct
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Award Number
VA247-C-1156
 
Award Date
9/27/2010
 
Awardee
AMERICAN PATRIOT CONSTRUCTION, INC.;2849 BLANDING BLVD;MIDDLEBURG;FL;320686336
 
Award Amount
$7,125,000.00
 
Line Number
Deductive Bid Alternate #3
 
Description
MAIN BID ITEM: The scope of this project is to construct three metal stud and brick veneer buildings with sloped roof framing of light gauge metal trusses. The two Cottage buildings are one story, approximately 10,000 square feet each and the Rehabilitation/Recreation Center is to be two levels with an elevator and stair of approximately 15,000 square feet total. Reference drawings dated May 5, 2010 as listed in Section 00 01 15 LIST OF DRAWING SHEETS. Time for completion for the work is five hundred forty-eight (548) calendar days. DEDUCTIVE BID ALTERNATE #1 All work as specified in Main Bid Item except delete all synthetic shingles called for on Buildings 145, 146, and 147 and replace with Asphalt Shingles in Section 07 31 13, ASPHALT SHINGLES. Time for completion for the work is 548 calendar days. DEDUCTIVE BID ALTERNATE #2 All work as specified in Deductive Bid Alternate #1 except delete build out of Cottage Level of Building 145 to the extent indicated on drawings numbers 145.A-102-A and 145.A-103-A and similar plumbing, mechanical and electrical drawings with additional door and separation wall shown on drawing 145.A-102-A. Gypsum board on interior face of exterior walls is not deleted as part of this alternate. Shelled space is to be unfinished, but will include rough-in of utility systems and temporary construction as shown. Time for completion for the work is 548 calendar days. DEDUCTIVE BID ALTERNATE #3 All work as specified in Deductive Bid Alternate #2 except delete Cottage 147, including site work as described on drawings L-101A, C-103-A, C-104-A, C-105-A, and C-106-A and other systems requirements drawings for that building. Time for completion for the work is 485 calendar days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/TuVAMC679/TuVAMC679/VA24710IB0062/listing.html)
 
Record
SN02297786-W 20100929/100927234448-a21bb53e85d23191fd2bc6997f0e7565 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.