Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 12, 2010 FBO #3214
MODIFICATION

Y -- Repair Data Lab & FTI Building 423

Notice Date
9/10/2010
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Air Force, Air Combat Command, 99 CONS, 5865 Swaab Blvd, Nellis AFB, Nevada, 89191-7063, United States
 
ZIP Code
89191-7063
 
Solicitation Number
FA4861-10-R-A029
 
Archive Date
9/28/2010
 
Point of Contact
William F. Barrett, Phone: 7026529335, Richard C. Jedlinski, Phone: 702-652-9121
 
E-Mail Address
william.barrett@nellis.af.mil, richard.jedlinski@nellis.af.mil
(william.barrett@nellis.af.mil, richard.jedlinski@nellis.af.mil)
 
Small Business Set-Aside
HUBZone
 
Description
Q1) Will the 100% design drawings from HDR Engineering, Inc. be provided to the winning bidder in AutoCAD format? A1. AutoCAD drawings will be provided to successful bidder. Q2) If so, will the drawings be unlocked (not read-only) so that they may be used to create the As-Builts? A2. Drawings will be unlocked and can be used for as-builts. Q3) The cover sheet states that the drawing set is "For Construction". However, the Fire Protection sheets of the drawing set, FP100 through FP109, contain the disclaimer that "These concept drawings are for information only to show potential system arrangement. Contractor shall field verify all information contained on these drawings and is responsible for the design and installation of the system IAW the specifications." 1) Should bidders include costs to design the fire protection system? 2) Will a "Design" performance period be added in addition to the 220 CD for construction? A3. Project fire protection drawings and specifications are procurement documents. Contractor shall provide professionally stamped fire protection system shop drawings/system design per requirements stated in project drawings, specifications, and UFC 3-600-01. Shop drawings shall be submitted per contractor’s approved submittal schedule. Q4) Reference: Attachment #3; Technical Specification; Section 08 71 00; paragraph 3.6; Hardware Sets. The door hardware schedule for 14 doors is prefaced with the statement: "(Coordinate hardware with Base Access Control System - Door to be card reader operated and alarmed with BMS - security hardware to be installed by others.)" Questions: 1) What is the "Base Access Control System"? Is it user supplied or Contractor supplied? 2) What "security hardware" will be installed by others? A4. Access Control System for facility (main panel, electronic card readers, key pads) will be Government furnished and installed. Specified door hardware, balanced magnetic switches, and conduit/junctions boxes for ACS are Contractor furnished and installed. Q5) Telecommunication Plan sheets ET102 and ET105 reference CAT 6 cable. Telecommunication Plan sheets ET102 and ET104 reference CAT 6E cable. Question: Which type of cable is to be used for this project; CAT 6 or CAT 6E. A5. Provide CAT 6 cable per project specifications.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/99CONS/FA4861-10-R-A029/listing.html)
 
Record
SN02277467-W 20100912/100911000909-fc2c0b1b4cda02fde4fac78f3709ab7a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.