Z -- Design Build Services for the Replacement of Boiler #3 at the Michael E. DeBakey VA Medical Center.

Notice Date
8/25/2010
 
Notice Type
Special Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of Veterans Affairs;Purchasing and Contracts;Michael E. DeBakey VA Medical Center;2002 Holcombe BLVD;Houston TX 77030 4298
 
ZIP Code
00000
 
Solicitation Number
VA25610RP0382
 
Response Due
7/31/2010
 
Archive Date
10/24/2010
 
Point of Contact
Antonio Jackson
 
E-Mail Address
Contract Specialist
(tony.jackson@va.gov)
 
Small Business Set-Aside
N/A
 
Description
PLEASE BE ADVISED THAT THIS PROJECT WILL BE PROCURED AS A SOLE SOURCE SERVICE DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. The Michael E. DeBakey VA Medical Center Houston, TX has a requirement for Project # 580-08-111, "Design Build Services to replace Boiler #3 at the MEDVAMC Boiler Plant. This opportunity is only available to a sole contractor under public law 109-461 and 38 USC 8127 (c). A Firm-Fixed Price sole source contract award is anticipated. The contractor shall provide design build services to remove existing water tube boiler #3. Provide new energy efficient Hurst 1000 HP @ 125 psi packaged steam fire tube boiler with trim (accessories), dual fuel low NOx (natural gas, No. 2 and B20 fuel oil) Weishaupt burner, fuel valves, fuel train piping, breeching, flue gas economizer, heat recovery, deaeration tank, fuel meters, other accessories, asbestos (ACM) insulation removal, plant steam valves and steam piping replacement complete and ready to use. Project includes facility wide steam trap repair and/or replacement, new steam trap monitoring system, boiler feed pump replacement, and new steam header bypass piping. All new boiler equipment and accessories shall match existing manufacture as boilers #1 and #2. All work and materials shall meet VA Specifications and standards.The project duration shall be 270 calendar days from receipt of a Notice to Proceed. RELATED WORK BUT NOT LIMITED TO THE FOLLOWING : Engineering (to include drawings and specifications) Permitting (state and local) Demolition Painting Common work items for steam generation. Valves for boiler trim, non return stop check valves, blowoff valves, piping for fuel, feedwater valve trains, and steam. Controls, pressure gages, thermometers Miscellaneous piping installation, repair, and replacement Miscellaneous steam valve replacement Demonstrations and testing of the boiler and equipment Overhead rollup door installation (20 X 20 ) Emission testing Thermal insulation Gas regulators for boilers 1 and 2 Security gates for two (2) 20 rollup doors (8 x20 ) An approved Justification and Approval (J&A) will be posted to this site on or about August 27, 2010.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/HoVAMC/VAMCCO80220/VA25610RP0382/listing.html)
 
Record
SN02253858-W 20100827/100825234903-b130ce1b0d35290bfac86669b2c0f75c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.