Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 13, 2010 FBO #3184
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 76029, San Francisco Bay, Delta Model Structure, CA FRONT ENTRANCE DECK RENOVATION BAY MODELS VISITOR CENTER SAUSALITO CA

Notice Date
8/11/2010
 
Notice Type
Award Notice
 
NAICS
238190 — Other Foundation, Structure, and Building Exterior Contractors
 
Contracting Office
USACE District, San Francisco, ATTN: CESPN-CT, 1455 Market Street, San Francisco, CA 94103
 
ZIP Code
94103
 
Solicitation Number
W912PL-10-D-0006-0001
 
Archive Date
9/10/2010
 
Point of Contact
Rolando Z. Camerino, (415) 503-6959
 
E-Mail Address
USACE District, San Francisco
(rolando.z.camerino@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PL-10-D-0006-0001-P00002
 
Award Date
7/30/2010
 
Awardee
HAL HAYS CONSTRUCTION, INC. (788552032)<br> 1835 CHICAGO AVE STE C<br> RIVERSIDE, CA 92507-2309
 
Award Amount
$272,254.92
 
Line Number
0021
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Design Build MATOC, Vertical Projects USACE Los Angeles District This contract action was accomplished using other than competitive procedures because this is a task/delivery order where an exception to fair opportunity requirements was approved as this is a follow-on order to a competitive initial order (FAR 8.405-6(b)(2) or 16.505(b)(2)(iii). Remove existing TREX deck system and replace with interlocking paver system. Scope: Plan is to replace existing Trex deck with paver stones (pavers). We will also require up to 5 Nautical and/or Army Corps themed emblems/medallions designed into various parts of the deck area, using paver stones. Work will be on the deck area located directly in front of the Bay Model Visitor Center, 2100 Bridgeway and Sausalito. bldg and shall consist of removing approx. 5500 sq of Trex decking, metal grates, underlying supports joists and pier posts. This will be followed by an inspection of drain and sewer piping in void space under deck prior to back filling-in and laying of paver stones. Additional drainage weep holes may need to be added in the existing retaining wall located on the easterly edge of the southern-most portion of the deck area. Paver stones supplied by the contractor must be manufactured in the United States.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACAW07/W912PL-10-D-0006-0001/listing.html)
 
Record
SN02236756-W 20100813/100811235331-192e9bc34722e4e1a2597fb7f7d54018 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.