Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 05, 2010 FBO #3176
SOLICITATION NOTICE

17 -- Aircraft Electrical Supply System Upgrade - Drawing E-03 - Drawing E-02 - Specifications

Notice Date
8/3/2010
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
335999 — All Other Miscellaneous Electrical Equipment and Component Manufacturing
 
Contracting Office
Department of Homeland Security, United States Coast Guard (USCG), Commanding Officer, USCG Aviation Logistics Center, HU25, HH65, H60J, C130, ESD, IOD, ISD, CASA or ALD, Elizabeth City, North Carolina, 27909-5001, United States
 
ZIP Code
27909-5001
 
Solicitation Number
HSCG38-10-Q-500033
 
Archive Date
8/31/2010
 
Point of Contact
Renee L. Wood, Phone: 252-335-6541, Tabitha L Callon, Phone: 252-335-6895
 
E-Mail Address
renee.l.wood@uscg.mil, tabitha.l.callon@uscg.mil
(renee.l.wood@uscg.mil, tabitha.l.callon@uscg.mil)
 
Small Business Set-Aside
N/A
 
Description
115 VAC/400-Hz Aircraft Electrical Supply System Upgrade at USCG HITRON Jacksonville, Florida Drawing E-02 Drawing E-03 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation number HSCG38-10-Q-500033is issued as a Request for Quotations (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-44. The applicable North American Industry Classification Standard Code is 335999 and the size standard to qualify as a small business is 500 employees. The USCG anticipates award of a single firm fixed price purchase order. The USCG is soliciting quotes for the following: Hangar Installed 115 VAC/400-Hz Aircraft Electrical Supply System Upgrade. The Government's specifications and two drawings are included as attachments. All equipment must be new material. The offeror shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided such warranty is available at no additional cost to the Government. Acceptance of the standard commercial warranty does not waive the Government's rights under the Inspection clause nor does it limit the Government's right with regard to the other terms and conditions of this contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty. The contractor shall provide a copy of its standard commercial warranty (if applicable) with its response. DELIVERY: The required delivery date is 15 Oct 2010. All items shall be delivered to the following address: USCG HITRON Jacksonville, 13520 Aerospace Way, Cecil Field Hangar 13, Jacksonville, FL 32221. PACKAGING AND MARKING: Packaging, packing, and preservation shall be in accordance with best commercial practices. Packaging material shall not consist of the following: popcorn, shredded paper, Styrofoam of any type, or peanut packaging. Items shall be individually packaged and labeled. INSPECTION AND ACCEPTANCE: Inspection and acceptance shall be completed by the Government at the place of delivery. INTERESTED PARTIES: All responsible sources may submit an offer which shall be considered by the agency. All interested parties must have a DUNS number, a Taxpayer Identification Number, and be registered in the Central Contractor Registration (CCR) at www.ccr.gov. Only vendors registered in CCR can be awarded a contract. Offerors shall be registered in the Online Representations and Certifications (ORCA) website at http://orca.bpn.gov OR include a completed copy of the provision FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS COMMERCIAL ITEMS, with their proposal. FAR 52.212-3 can be found at http://acquisition.gov/comp/far/loadmainre.html. REJECTION OF PROPOSAL: Failure to demonstrate compliance with the requirements of the preceding paragraph will be cause to reject the proposal without further discussion. The following FAR provisions and clauses apply to this request for quotation and are either shown in full text or incorporated by reference: 52.252-2 Clauses Incorporated by Reference (FEB 1998). This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address www.acquisition.gov.far.index.html. 52.211-14 Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use (Apr 2008) 52.212-1 Instructions to Offerors - Commercial Items (Jun 2008) 52.212-2 Evaluation-Commercial Items (Jan 1999) (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: 1. Technical capability of the items offered to meet the Government's required specifications 2. Past performance 3. Price Technical and past performance when combined, are significantly more important than price. (b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). (c) A written notice of award or acceptance of an offer, mailed or otherwise furnished, to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. (End of provision) 52.212-3 Offeror Representations and Certifications-Commercial Items (Aug 2009) An offeror shall complete only paragraph (j) of this provision if the offeror has completed the annual representations and certifications electronically at http://orca.bpn.gov If an offeror has not completed the annual representations and certifications electronically at the ORCA website, the offeror shall complete only paragraphs (b) through (i) of this provision. 52.212-4 Contract Terms and Conditions Commercial Items (Jun 2010) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-- Commercial Items (July 2010) (a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)). 0Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)). (1) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553). (2) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78) (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: 0 (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402). 0 (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)). 0 (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.) 0 (4) 52.204-11, American Recovery and Reinvestment Act-Reporting Requirements (Jul 2010) (Pub. L. 111-5). 0 (5) 52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999) (15 U.S.C. 657a). 0 (6) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (July 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a). 0 (7) [Reserved] 0 (8)(i) 52.219-6, Notice of Total Small Business Set-Aside (June 2003) (15 U.S.C. 644). 0 (ii) Alternate I (Oct 1995) of 52.219-6. 0 (iii) Alternate II (Mar 2004) of 52.219-6. 0 (9)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644). 0 (ii) Alternate I (Oct 1995) of 52.219-7. 0 (iii) Alternate II (Mar 2004) of 52.219-7. 0 (10) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)). 0 (11)(i) 52.219-9, Small Business Subcontracting Plan (Apr 2008) (15 U.S.C. 637(d)(4). 0 (ii) Alternate I (Oct 2001) of 52.219-9. 0 (iii) Alternate II (Oct 2001) of 52.219-9. 0 (12) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)). 0 (13) 52.219-16, Liquidated Damages Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F) (i)). 0 (14)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer). 0 (ii) Alternate I (June 2003) of 52.219-23. 0 (15) 52.219-25, Small Disadvantaged Business Participation Program-Disadvantaged Status and Reporting (Apr 2008) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323). 0 (16) 52.219-26, Small Disadvantaged Business Participation Program-Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323). 0 (17) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004)(15 U.S.C.657f). 1 (18) 52.219-28, Post Award Small Business Program Representation (Apr 2009) (15 U.S.C 632(a)(2)). The following paragraph of this clause may require completion: (g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following representation and submit it to the contracting office, along with the contract number and the date on which the representation was completed: The Contractor represents that it __ is, __ is not a small business concern under NAICS Code __________________ assigned to contract number ______________________. [Contractor to sign and date and insert authorized signer's name and title]. 1 (19) 52.222-3, Convict Labor (June 2003) (E.O. 11755). 1 (20) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jul 2010) (E.O. 13126). 1 (21) 52.222-21, Prohibition of Segregated Facilities (Feb 1999). 1 (22) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). 0 (23) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212). 1 (24) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793). 0 (25) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212). 0 (26) 52.222-54, Employment Eligibility Verification (Jan 2009). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.) 0 (27)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.) 0 (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available of-the-shelf items.) 0 (28) 52.223-15, Energy Efficiency in Energy Consuming Products (Dec 2007) (42 U.S.C. 8259b). 0 (29)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423). 0 (ii) Alternate I (Dec 2007) of 52.223-16 1 (30) 52.225-1, Buy American Act-Supplies (Feb 2009) (41 U.S.C. 10a-10d). 0 (31)(i) 52.225-3, Buy American Act-Free Trade Agreements-Israeli Trade Act (Jun 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169 109-283, and 110-138). 0 (ii) Alternate I (Jan 2004) of 52.225-3. 0 (iii) Alternate II (Jan 2004) of 52.225-3. 0 (32) 52.225-5, Trade Agreements (Aug 2009) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note). 1 (33) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). 0 (34) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150). 0 (35) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.5150). 0 (36) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)). 0 (37) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)). 1 (38) 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (Oct 2003) (31 U.S.C. 3332). 0 (39) 52.232-34, Payment by Electronic Funds Transfer-Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332). 0 (40) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332). 0 (41) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a). 0 (42)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). 0 (ii) Alternate I (Apr 2003) of 52.247-64. (c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: [Contracting Officer check as appropriate.] 0 (1) 52.222-41, Service Contract Act of 1965, as Amended (Nov 2007) (41 U.S.C. 351, et seq.). 0 (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). This clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332. This statement is for information only; it is not a Wage Determination. Employee Class Monetary Wage -- Fringe Benefits 0 (3) 52.222-43, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). 0 (4) 52.222-44, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). 0 (5) 52.222-51, Exemption from Application of the Service Contract Act to Contract for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007) (41 U.S.C.351, et seq). 0 (6) 52.222-53, Exemption from Application of Service Contract Act to Contract for Certain Services- Requirements (Feb 2009) (41 U.S.C. 351, et seq.) 0 (7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247). 0 (8) 52.237-11, Accepting and Dispensing of $1 coin (Sept 2008) (31 U.S.C. 5112(p)(1). (d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-Negotiation. (1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract. (2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved. (3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law. (e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (i) through (vii) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause- (i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)). (ii) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities. (iii) [Reserved] (iv) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). (v) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212). (vi) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793). (vii) [Reserved] (viii) 52.222-41, Service Contract Act of 1965, as Amended (Nov 2007) (41 U.S.C. 351, et seq.). (ix) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g) 0 Alternate 1 (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)). (x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007) (41 U.S.C., et seq.). (xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (Nov 2007) (41 U.S.C. 351, et seq.). (xii) 52.222-54, Employment Eligibility Verification (Jan 2009) (xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009)(Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6. (xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64. (2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations. (End of clause) NOTICE FOR FILING AGENCY PROTESTS It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accountability Office (GAO). Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman. Informal forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the USCG Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable). Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester's concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency's goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103. If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted to: Department of Homeland Security United States Coast Guard (CG-9131) Ombudsman Program for Agency Protests 1900 Half Street, SW, Room 11-0602 Washington, D. C. 20593-0001 Hotline telephone number: 202.372.3695 FAX: 202.475.3904 All responsible sources may submit a capability statement, proposal, or quote which shall be considered by the agency. Any amendment and documents related to this procurement will be available electronically at the Internet site: http://www.fbo.gov. Potential offerors will be responsible for downloading their own copy of the documents related to this procurement, if any. Closing date and time for receipt of offers is August 16, 2010 at 3:00 P.M., EST. Anticipated award date is on or about August 20, 2010. Contact Renee Wood at Renee.L.Wood@uscg.mil for questions regarding this solicitation. Quotes will be accepted via e-mail or at the following address: USCG ALC, ESD, Bldg 78, Attn: Renee Wood, Elizabeth City, NC 27909.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/USCGARSC/HSCG38-10-Q-500033/listing.html)
 
Record
SN02227382-W 20100805/100803235841-1395436376720eb2985a751dade3bcce (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.