Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 31, 2010 FBO #3171
AWARD

R -- RECOVERY--R--Emergency Water Supply Line Replacement. Engineering and Design - Alternative X-Option C Tunnel & 72 pipeline and Alternative 3A Pump Station and 36 Pipeline. Don Clausen Fish Hatchery Warm Springs Dam Sonoma County, CA.

Notice Date
7/29/2010
 
Notice Type
Award Notice
 
NAICS
541330 — Engineering Services
 
Contracting Office
USACE District, San Francisco, ATTN: CESPN-CT, 1455 Market Street, San Francisco, CA 94103
 
ZIP Code
94103
 
Solicitation Number
W912P7-10-D-0004
 
Archive Date
8/28/2010
 
Point of Contact
Rolando Z. Camerino, (415) 503-6959
 
E-Mail Address
USACE District, San Francisco
(rolando.z.camerino@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912P7-10-D-0004-0002
 
Award Date
7/28/2010
 
Awardee
HNTB-GERWICK JV (829344840)<br> 20 CALIFORNIA ST STE 400<br> SAN FRANCISCO, CA 94111-4832
 
Award Amount
$2,123,799.45
 
Line Number
0001-0004
 
Description
This project is for work required to complete the Engineering and Design (E&D) for two separate Alternatives. The A-E shall prepare two separate packages of Plans and Specifications as well as a Design Documentation Report for each alternative. Both Alternatives are intended as Emergency Water Supply Line Alternatives for the Don Clausen Fish Hatchery, at Warm Springs Dam, Sonoma County, California. Successful completion of this SOS involves: A.The preparation of plans and specifications packages that reflects 65% of completion. B.Design Documentation Reports (DDR) that shall reflect as a minimum the completion of a DDR that was prepared for a feasibility study during the planning stage. The DDR shall document the detailed design/analysis for all project features including pre-design geotechnical investigation and surveying. Alternative X-Option C proposes a tunnel construction through the left abutment and 72-inch outlet pipe construction that connects to the wet well and to the Sonoma County Water Board pipeline. The design of this alternative shall account for and be integrated with the design and construction plans for the outlet water pipe construction to be tied to this project as designed by the Sonoma County Water Board. Alternative 3A proposes a Pump station construction and the tie-in to the wet well in the Control Structure as well as a 36-inch pipeline construction over the left abutment and connection to the stilling basin for the hatchery. Required completion includes preparation of the design plans, design specifications, construction cost estimate, construction schedule for the project to 65% completion.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACAW07/Awards/W912P7-10-D-0004-0002.html)
 
Record
SN02222847-W 20100731/100730000053-8027c8d9ecc06ec8e96306c312766426 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.