MODIFICATION

99 -- Caterpillar Model C18 Outdoor Generator

Notice Date
7/29/2010
 
Notice Type
Modification/Amendment
 
NAICS
335312 — Motor and Generator Manufacturing
 
Contracting Office
Department of the Air Force, Pacific Air Forces, 36 CONS - Andersen, Unit 14040, Andersen AFB, 96543-4040
 
ZIP Code
96543-4040
 
Solicitation Number
N4155710RC102FS
 
Archive Date
8/21/2010
 
Point of Contact
Lourdes V. Leon Guerrero, Phone: 6713663686
 
E-Mail Address
lourdes.leonguerrero@andersen.af.mil
(lourdes.leonguerrero@andersen.af.mil)
 
Small Business Set-Aside
N/A
 
Description
New Respnse Date: Friday, 6 August 2010, 4:00 pm EST SITE VISIT: Date: Monday, 2 August 2010 Time: 10:30 am Place: Andersen AFB, Guam Front Gate for Base Passes For those not requiring passes, please meet at the AAFB Fitness Center back parking lot (next to the existing generator equipment) at 11:00 am Contact Person: Lourdes V. Leon Guerrero Email: lourdes.leonguerrero@andersen.af.mil Tel: (671) 366-3686 Responses to Inquiries: 1. Can the contractor remove the old generator at any time prior to the arrival of the new generator? Yes, but the contract must make prior arrangements with 36 CES. The cables for the existing unit need to be protected from the weather/elements while awaiting the installation of the new unit. 2. Where is will the old generator be placed and is the contractor required to dispose of the old generator? The old generator may be kept on site (make prior arrangements with 36 CES) until the job is completed. It may also be removed & stored in Building 20010. 3. Please provide specific requirements for lift equipment to access the base i.e., crane or forklift? Based on the contractor assessment (during the site visit) you may determine whether or not you will need lift equipment for this project. There is a beautification wall around the existing unit so a crane may be necessary. 4. Will the contractor be allowed temporary badges for it's workers or subcontractors for base acces to perform the required work? Yes, contractor will work with 36 CONS Contract Administrator to get the necessary passes. 5. There is not mention of an Automatic Transfer Switch (ATS) for the generator or is there already an ATS in place. YES If yes, is it possible to get the specifications of the ATS or allow the potential contractor(s) to look at the ATS at the site visit? YES 6. Will the contractor utilize existing wiring in place or will the contractor be required to change all the wiring to the building? It's best to provide a generator that matches the existing wiring.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/PAF/36CONS/N4155710RC102FS/listing.html)
 
Record
SN02221597-W 20100731/100729234742-5bfb5d3073170d8a7ff71fc630435ec7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.