Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 30, 2010 FBO #3170
MODIFICATION

Z -- KETCHUM - FEATHERVILLE ROAD RESURFACING

Notice Date
7/28/2010
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Forest Service - R-4 SW Idaho/Nevada Acquisition Office
 
ZIP Code
00000
 
Solicitation Number
AG-0261-S-10-0049
 
Archive Date
9/15/2010
 
Point of Contact
KAREN L. MORTHLAND, Phone: 2083734115, KEVIN DUCHOW, Phone: (208) 737-3318
 
E-Mail Address
KMORTHLAND@FS.FED.US, KDUCHOW@FS.FED.US
(KMORTHLAND@FS.FED.US, KDUCHOW@FS.FED.US)
 
Small Business Set-Aside
HUBZone
 
Description
KETCHUM – FEATHERVILLE ROAD RESURFACING PROJECT IN APPROXIMATELY 15 DAY’s, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT This project consists of repair and replacement of several culverts, cleaning and re-establishing the ditches, reconditioning the base of the roadway including establishing a 4% crown, placing fill to raise the grade of the road in short stretches, widening and narrowing the base of the roadway to 26 feet, and placing 4” of compacted gravel mixed with bentonite for surfacing. The gravel will be government supplied and will be stockpiled near the intersection of Road 70227, the Ketchum-Featherville Road, with the Baumgartner Campground Road, #70487. Minor work associated with the project may include but not limited to; minor alignment adjustments and removing the berms that have been built up along the road from years of blading, in some areas the berms will have to be removed by a backhoe, excavator, or a machine with a bucket to pull the material back into the road while not getting any in the river. CONTACT KEVIN DUCHOW, (208) 737-3318 FOR MORE INFORMATION. ESTIMATED PRICE RANGE: $100,000 to $250,000 CONTRACT TIME WILL BE 200 calendar days. The project cannot begin until after Labor Day, on September 7, 2010. The work will only be performed between the day after Labor Day until December 2 of each year and from May 1 until the Thursday before Memorial Day of each year. NAICS Code: 237990 Size Standard: $33.5. This proposed procurement is a TOTAL HUB ZONE set-aside.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-10-0049/listing.html)
 
Place of Performance
Address: The location of the project is from the end of the pavement near the town of Featherville, Idaho to the intersection of Road #70487 Heading toward Baumgartner Campground, roughly 9 miles. As well as the section of road from that intersection to the bridge across the South Fork of the Boise River, roughly ¼ mile in length., United States
 
Record
SN02220033-W 20100730/100728234714-2cffb2b010f05eea3d0716b36bae8c13 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.