SOLICITATION NOTICE
Y -- Willow Creek Trail Bridge
- Notice Date
- 7/16/2010
- Notice Type
- Presolicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-2 Rocky Mountain Region, 740 Simms Street, Regional Office, Golden, Colorado, 80401
- ZIP Code
- 80401
- Solicitation Number
- AG-82MK-S-10-0014
- Archive Date
- 9/14/2010
- Point of Contact
- Joel A Butzin, Phone: 970-874-6613
- E-Mail Address
-
jbutzin@fs.fed.us
(jbutzin@fs.fed.us)
- Small Business Set-Aside
- N/A
- Description
- Installation of a 60'x8' trail bridge across Willow Creek, along with approach trail and bridge approaches. Successful bidder shall be responsible to secure the design, fabrication and installation of the bridge and associated abutments. Concrete abutments and wing walls may be either cast in place or precast design. Approach trails shall be 8' wide with aggregate surfacing.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/82X9/AG-82MK-S-10-0014/listing.html)
- Place of Performance
- Address: From Gunnison, Colorado, proceed northerly along Colorado Highway 135 approx. 8 miles to Almont, Colorado; thence north easterly along Taylor Canyon Road, Country Road (CR) 742 approx.23.5 miles to point where Willow Creek passes under Taylor River Road. The Willow Creek Bridge will be installed approx. 100 feet upstream of the Taylor River road bridge. Approach trail begins across from the intersection with National Forest System Road (NFSR) 765 and access to Taylor Park Trading Post, and continues to the bridge abutment on the north side, then from the southerly abutment to Gunnison County Road 55, Union Park Road, Almont, Colorado, United States
- Record
- SN02208549-W 20100718/100716235007-51353b4f0dcad23a7a9c994ca4556c24 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |