Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 18, 2010 FBO #3158
MODIFICATION

Z -- CUSTER NATIONAL FOREST - Sage Creek Culvert Replacement

Notice Date
7/16/2010
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer; Helena; Gallatin; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
 
ZIP Code
00000
 
Solicitation Number
AG-0355-S-08-0021
 
Archive Date
7/19/2010
 
Point of Contact
Gary B. Stephens, Phone: (406) 587-6774, Katherine M Kuharski, Phone: 406-587-6763
 
E-Mail Address
gbstephens@fs.fed.us, kkuharski@fs.fed.us
(gbstephens@fs.fed.us, kkuharski@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
This project includes the removal and disposal of existing steel plate culvert, and installation of new corrugated metal pipe arch culvert with lean concrete material for bedding and backfill. A precast concrete cutoff wall is to be furnished and installed. Also included in the project is the furnishing and placing of aggregate surfacing and riprap rock. Traffic control and pollution prevention will be the responsibility of the Contractor. Disturbed sites, outside of the traveled-way, are to be reseeded. Work on this project will also consist of furnishing and placing unclassified borrow for roadway embankment construction. Roadway embankment borrow is to come from a commercial source or Forest Service pit, if approved. Project Location – The project is located in Section 18, T7S, R26E, on Road #2038 (Pryor Mountain Road) approximately 23 miles southeast of Bridger, Montana. Price Range – Between $25,000 and $100,000. Pre-bid Tour – No prebid tour is planned for this project. Prospective bidders wishing to visit the site on their own may obtain directional information by contacting Jacob Ormes at the Forest Supervisor's Office, Custer National Forest, Billings, Montana, telephone (406) 657-6205 ext. 265, or the Beartooth District Office, Red Lodge, Montana, telephone (406) 446-2103. Start Work – It is estimated that work will begin in August 2008. Period of Performance – Work shall be completed by October 31, 2008. Government Furnished Materials – A borrow source for roadway embankment is located on National Forest System Lands, approximately 1.5 miles to west of project area. Contractor is responsible for development and reclamation of the pit, and for the proper mixing, delivery and placing of the material. It is anticipated the solicitation for this project will be posted to the FBO website the week of July 21, 2008.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-0355-S-08-0021/listing.html)
 
Place of Performance
Address: Pryor Mountain Road, Beartooth Ranger District, Custer National Forest, Red Lodge, Montana, 59068, United States
Zip Code: 59068
 
Record
SN02208236-W 20100718/100716234748-e61011a31754f9040559911f861ef12b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.