FBO DAILY ISSUE OF JULY 16, 2010 FBO #3156
MODIFICATION

C -- IDIQ Contract for Architect-Engineer or Engineering Services for Design of Pavement, Utility, and Civil Design, and GeoTechnical Engineering Services in the NAVFAC AOR

Notice Date
7/14/2010
 
Notice Type
Modification/Amendment
 
NAICS
541330 — Engineering Services
 
Contracting Office
N62470 NAVFAC ATLANTIC Code AQ 6506 Hampton Blvd, Building A Norfolk, VA
 
ZIP Code
00000
 
Solicitation Number
N6247010R2039
 
Response Due
7/26/2010
 
Archive Date
8/10/2010
 
Point of Contact
Michelle Gooden 7573228169
 
E-Mail Address
michelle.gooden@navy.mil
(michelle.gooden@navy.mil)
 
Small Business Set-Aside
N/A
 
Description
Amendment 03 Question - We would appreciate clarification on the Evaluation Factor 1 (Specialized Experience) as stated in the Selection Criteria. The statement is made that the Contractor is to provide "a maximum of six (6) projects substantially completed between June 2007 and June 2010." Given this is a design-services contract, is this statement meant to imply completed designs? Or does is mean physically completed projects? If it does mean physically completed projects, does the term "substantially completed" mean fully useable by the Owner or would some completed portion of the overall project be acceptable (like a certain percentage)? Answer - Evaluation Factor 1 states "The Contractor shall provide a maximum of six (6) projects substantially completed between June 2007 and June 2010, that best demonstrate specialized experience relevant to the work proposed under this contract; knowledge of local codes, laws, permits and construction materials and practices in the contract area; and knowledge of and extent of experience applying sustainability concepts, including low impact development and DoD criteria." In this factor the following definitions shall apply:."Projects" are defined as design projects."substantially completed" is defined as 80% of the design project has been completed
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62470CON/N6247010R2039/listing.html)
 
Record
SN02206256-W 20100716/100714235612-6178025ebee01dd74d87e64cd8e43292 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)