Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 05, 2010 FBO #3084
MODIFICATION

Z -- *RECOVERY* Cradle of Forestry - Improving Accessibility - Pisgah National Forest, NC - Amendment 1

Notice Date
5/3/2010
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, Eroc East, 1720 Peachtree Road NW, Atlanta, Georgia, 30309, United States
 
ZIP Code
30309
 
Solicitation Number
AG-4419-S-10-0582
 
Response Due
5/14/2010 12:00:00 PM
 
Point of Contact
Mark L Kamholtz, Phone: 4043472517, Gary S. Baber, Phone: 8282574358
 
E-Mail Address
mkamholtz@fs.fed.us, gsbaber@fs.fed.us
(mkamholtz@fs.fed.us, gsbaber@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Cradle Trail Sign-in Sheet SF30 - Amendment 1 SF30 - Amendment 1 The purpose of this amendment is to provide: 1) Responses to questions asked at the pre-bid meeting: ******************************************************** 1. Sheet P1 of 29 of the Drawings states "Remove 4" existing gravel & reuse as directed by COR. Clean excess fill to be spread evenly over existing roadbed. Compact fill to be suitable for seeding. seed & mulch" *** Reply *** This note should be restated to say " Remove existing stone in the areas of the constructed trail that will be effected with the new grading plan. Transition the existing trail into the new proposed grades and reuse the existing gravel/stone by removing prior to grading and reusing as the finished surface material." 2. Sheet P2 of 29 of the Drawings states "Remove 4" existing gravel & reuse as directed by COR. Clean excess fill to be spread evenly over existing roadbed. Compact fill to be suitable for seeding. seed & mulch" ***REPLY*** This note should be restated to say " Remove existing stone in the areas of the constructed trail that will be effected with the new grading plan. Transition the existing trail into the new proposed grades and reuse the existing gravel/stone by removing prior to grading and reusing as the finished surface material." 3. Specification 02230 Clearing - This specification requires all clearing material to be removed from the project. *** REPLY *** Add note to 3.01 Clearing under the execution part 3 to read. D. All clearing debris shall be removed from the project site and disposed of by the contractor, or shipped on site and disposed of in areas designated by the COR within 1 mile of the project after shipping is complete. 2) Sign-in Sheet from pre-bid meeting - See attached ===================================================== All other terms and conditions remain unchanged.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/90843a83a71c9b49d0c0c892b676b3d3)
 
Place of Performance
Address: Pisgah National Forest, Cradle of Forestry, Transylvania County, North Carolina, United States
 
Record
SN02138987-W 20100505/100503235100-90843a83a71c9b49d0c0c892b676b3d3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.