Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 23, 2010 FBO #3072
AWARD

Y -- RECOVERY--Y--PROJECT NUMBER 30945, Renovate Barracks P-10132-Repair Doors, Ceilings, Walls, Electric, Plumbing

Notice Date
4/21/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Fort Drum DOC, Directorate of Contracting, 45 West Street, Fort Drum, NY 13602-5220
 
ZIP Code
13602-5220
 
Solicitation Number
W911S2-06-D-0006-0084-01
 
Archive Date
5/21/2010
 
Point of Contact
Cindy L. McAleese, 315-772-4112
 
E-Mail Address
Fort Drum DOC
(cindy.mcaleese@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W911S2-06-D-0006-0084-01
 
Award Date
4/8/2010
 
Awardee
ALUTIIQ GLOBAL SOLUTIONS LLC (614973852)<br> 3033 S PARKER RD STE 1111<br> AURORA, CO 80014-2921
 
Award Amount
$21,402.61
 
Line Number
2001
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): ALUTIIQ GLOBAL SOLUTIONS LLC W911S2-06-D-0006-0084 This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures. The Directorate of Contracting issued a modification to implement a change order to incorporate a design change IAW FAR 52.243-4. The modification includes changes to the plumbing design to avoid problems that arose at the 3rd BCT barracks that were recently renovated. The new scope calls for providing and installing a double 4X2 wye in the vertical sanitation line and plumb the two upper showers into it, a 4 wall cleanout at 48 AFF with a chrome cover, and a Spears transition fitting on the PVC supply line on the flush valves. The contractor shall also change the 4X3 tees and 4 tee to 4X3 wyes and 4 wye with a 45 degree elbow. The contractor will also repair broken vanity/vent lines in the block wall that were improperly repaired by the PW shops, and change the true union ball valves in the hallway to glued CPVC and PVC ball valves. Finally, the contractor shall install all necessary fire caulk in the fire separation areas in the stairwells. All necessary locations were confirmed with the fire department. The project was funded by the American Recovery and Reinvestment Act of 2009. This is not a request for quotation or a solicitation for offers.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/e1a6afc13fc428186897fe614940a41b)
 
Record
SN02128219-W 20100423/100421234856-e1a6afc13fc428186897fe614940a41b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.