Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 04, 2010 FBO #3053
MODIFICATION

Y -- RECOVERY - CA BLM 19006(1) Panoche Access Road and Trailhead

Notice Date
4/2/2010
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-10-B-00018
 
Archive Date
7/8/2010
 
Point of Contact
Ryan T. Olson, Phone: 7209633090, Aaron L. Sanford, Phone: 7209633566
 
E-Mail Address
ryan.olson@dot.gov, aaron.sanford@dot.gov
(ryan.olson@dot.gov, aaron.sanford@dot.gov)
 
Small Business Set-Aside
Competitive 8(a)
 
Description
THIS PROCUREMENT IS ADVERTISED AS AN 8(a) COMPETITIVE SET-ASIDE. It has been determined that competition will be limited to 8(a) firms located within the geographical area serviced by the Fresno, Sacramento, and San Francisco SBA District Offices and other 8(a) firms with a bona fide place of business within the geographical competitive area, and the designated NAICS code. PROJECT DETAILS: The CA BLM 19006(1), Panoche Access Road & Trailhead project consists of regraveling 7.7 miles of roadways and drainage improvements. The project is located near Mercy Hot Springs, approximately 70 miles east of Fresno. Principal work items include: 23,000 tons of aggregate surface course, 900 feet of steel pipe fence, and 100 feet of pipe culvert. The CA BLM 5403(1), South Cow Mountain Recreation Area project consists of asphalt surface treatment, placement of aggregate base, and drainage improvements on 1.95 miles of roadway on Mendo Lake Road in South Cow Mountain recreation Area near Lakeport. Principal work items include: 5,100 tons of aggregate base, 300 tons of asphalt pavement, 15,000 square yards of surface treatment designation 2B (chipseal), 14,000 square yards of earthwork geotextile type III-A, 160 feet of pipe culvert, and 4 end sections. The CA BLM 19041(1) & 19043(1), Fort Ord project consists of drainage improvements and regraveling of up to 5.6 miles of roadway at Ford Ord in Monterey. Principal work items include: removal of an existing bridge, 1,900 yards of roadway excavation, 12,000 tons of aggregate base, 65 cubic yards of minor concrete, 320 cubic yards of placed riprap, 1,300 feet of pipe culvert, 39 pipe end sections, and 4 end sections.. Tentative advertisement date is April 8, 2010. Bids will be due 30 days aftre advertisement. This project is a one season job. Estimate cost for the base Schedule and all Options is $1.0 to 4.0 million. PLEASE NOTE: The Invitation for Bid will be available for download on or after April 1, 2010, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD AT NO COST IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. Other information regarding this solicitation will also be available at the above website. Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@dot.gov or FAX to (720) 963-3360.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-10-B-00018/listing.html)
 
Place of Performance
Address: Panoche Hills Recreation Area, Fort Ord, and South Cow Mountain Recreation Area, Fresno, Monterey, and Lake Counties, CA, Fresno, California, United States
 
Record
SN02111926-W 20100404/100402235821-452b3df3af4e9c4f53a7c0c8d1d71328 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.