Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 04, 2010 FBO #3022
MODIFICATION

Y -- RECOVERY - AZ PRA CACH 10(2)

Notice Date
3/2/2010
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-10-B-00008
 
Archive Date
7/29/2010
 
Point of Contact
Tiffany C Atchison, Phone: 720-963-3090, Lori T. Kliethermes, Phone: 720-963-3355
 
E-Mail Address
tiffany.atchison@fhwa.dot.gov, lori.kliethermes@fhwa.dot.gov
(tiffany.atchison@fhwa.dot.gov, lori.kliethermes@fhwa.dot.gov)
 
Small Business Set-Aside
N/A
 
Description
This solicitation will be advertised on an unrestricted basis (full and open) on or about March 5, 2010. PROJECT DETAILS: The solicitation for this project will include 3 bid schedules, with the largest schedule being 10.48 miles of roadway. There will also be 3 options: (1) paved ditch repair on North Rim Spur Road; (2) Pavement overlay of the Thunderbird Lodge Parking Area; and (3) pavement overlay of the Cottonwood Campground. Estimated price range is between $6 and $12 million. Principal work items for this project include: lump sum construction survey and staking; lump sum contractor testing; 5,100 m2 of clearing and grubbing; 3,350 m of removal of asphalt curb; 5,900 m3 of unclassified borrow; 3,900 m of ditch recondition; 103,400 m2 of 100 mm depth pulverizing; 19,500 of method 2 roadway aggregate; 38,600 tons of superpave pavement; 1,075 tons of minor hot asphalt concrete; 149 tons of prime coat; 138 tons of tack coat; 3,575 m of asphalt curb; 1,550 m of concrete curb and gutter; 1,250 m2 of asphalt paved ditches; 850 m2 of concrete sidewalk, 830 m of guardrail system; 35,330 m of barbed wire fence; 67 metal gates; 2250 hours of traffic control; and 115 m of handrail fixtures. All of the above along with associated removal of items, roadway excavation, subexcavation, asphalt pavement milling, pipe culverts, pavement markings; and traffic control items. All items are estimates and are subject to change. Tentative advertisement date is March 5, 2010. The bid opening date will be approximately 30 days after the project is advertised. PLEASE NOTE: The Invitation for Bid is expected to be available for download on or after March 5, 2010, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD AT NO COST IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. Other information regarding this solicitation will also be available at the above website. Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-10-B-00008/listing.html)
 
Place of Performance
Address: Canyon DeChelly National Monument, P.O. Box 588, Chinle, Arizona, 86503, United States
Zip Code: 86503
 
Record
SN02080987-W 20100304/100302235530-8ddfd9e421fce30ab8e61c5dcf9dafed (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.