Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 03, 2010 FBO #3021
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 38867, Repair Roofs, Mechanical Systems, Electrical, Exterior Closures (Doors And Windows); Replace Steps and Ramps-- 14 buildings

Notice Date
3/1/2010
 
Notice Type
Award Notice
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
Fort Hood DOC, Directorate of Contracting, 761st Tank Battalion Avenue, Room W103, Fort Hood, TX 76544-5025
 
ZIP Code
76544-5025
 
Solicitation Number
W9115110B0001
 
Archive Date
3/31/2010
 
Point of Contact
Jennifer Parker, 254 287-9801
 
E-Mail Address
Fort Hood DOC
(jennifer.l.parker@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91151C0060
 
Award Date
2/26/2010
 
Awardee
BAM CONTRACTORS INC. (187645986)<br> 315 YORKTOWN ST<br> DALLAS, TX 75208-2032
 
Award Amount
$700,132.50
 
Line Number
0001 thru 0013
 
Description
RECOVERY TAS::21 2022::TAS PPS# 38867; Repair Roofs, Mechanical Systems, electrical, exterior closures (Doors & Windows); Replace Steps and Ramps14 Buidlings: Install Roofs on 13 Buildings. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. CONTRACT Number W91151-10-C-0060 WAS AWARDED TO BAM Contractors, of Dallas, Texas, as a competitive HUB Zone construction contract. This project encompasses the installation of a new membrane roof to include, but not limited to: Installation of -inch fanfold insulation over the existing roofing system and fasten. Installation of a white, custom prefabricated 40-mil single-ply membrane roofing system that is fabricated of a weft inserted low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides. Install prefabricated flashings around all curbs and deck penetrations in accordance with roofing specifications. Parapet walls that are not flush are to be filled flush with EPS insulation. Walls are to be encapsulated with white 40-mil membrane. Where parapet walls are visible from ground level, tan membrane shall be used. Remove existing roofing vents. Install 2-way breather vents every 1,000 square feet per specifications. Install 4-inch white PVC fascia bar with white cover to terminate the membrane roofing system around the perimeter of the building. All gutters to be cleared of any debris. The work will be completed at the following buildings: 113, 325, 6970, 7006, 7012, 7027, 12010, 23005, 24006, 43005, 56132, 57134, and 92065.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/ec84feced90ca4d4118d90c8dff66b22)
 
Record
SN02079219-W 20100303/100301234814-ec84feced90ca4d4118d90c8dff66b22 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.