Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 26, 2010 FBO #3016
SOLICITATION NOTICE

Z -- Buffalo CDF 4 Repair

Notice Date
2/24/2010
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Buffalo, 1776 Niagara St., Buffalo, New York, 14207-3199, United States
 
ZIP Code
14207-3199
 
Solicitation Number
W912P4-10-R-0005
 
Point of Contact
Walter Kamad, Phone: 7168794134, Ken Mackay, Phone: 716-879-4138
 
E-Mail Address
walter.kamad@usace.army.mil, kenneth.e.mackay@usace.army.mil
(walter.kamad@usace.army.mil, kenneth.e.mackay@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Estimated cost of project is between $1-5 Million The purpose of the project is to repair portions of the Buffalo Confined Disposal Facility #4 (CDF 4), perimeter dike. CDF 4 is located in Buffalo Harbor, NY and is situated in the outer harbor, adjacent to Lake Erie. It is designed to contain sediment dredged from the federal navigation channel within the harbor. The CDF consists of a perimeter dike which is constructed of sheetpile, core/filter stone and armor stone which serves to contain sediments within the facility and to protect the contained materials from waves, storms, and lake currents. The proposed work consists of repairing nine reaches of the perimeter dike totaling approximately 640 lf. Repairs will consist of grouting the voids within the stone of the perimeter dike adjacent to and on the CDF side of the sheet pile. The intent of the grouting is to re-establish a physical barrier near the center of the dike in areas where some of the sheet pile has shifted vertically and separated from the underlying filter stone. The grout must be placed to fill the voids in the dike stone in an area about 4' wide by 12.5' vertically. Grouting will start at the base of the armor stone and proceed downward through a 5-foot layer of underlayer stone, a 2.5-foot layer of core stone and extend about 5' into the filter stone. The Contractor will be responsible for providing a grout and grouting system to fill the voids as specified and verify that the installed material has adequately met contract requirements. Work will also include welding of some sheet pile interlocks. Prior to actually grouting the wall, the contractor will construct a test section where a replica of the wall is built, flooded with water, grouted, pumped out, and broken down to test contractors grout mixture. The work will likely require that all work be performed from floating plant. The plant may be located inside or outside the CDF perimeter. It is anticipated that a drill rig will be used to core through the dike stone to provide access for the grouting operation.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACW49/W912P4-10-R-0005/listing.html)
 
Place of Performance
Address: Buffalo Harbor, Buffalo, New York, 14207, United States
Zip Code: 14207
 
Record
SN02074349-W 20100226/100224235709-da179b39fe0a0b73695a697b2a1bda42 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.