SOLICITATION NOTICE

38 -- Tailrace Gantry Crane for Ice Harbor Dam, Burbank, Washington. A fixed-price supply with install and demolition type contract.

Notice Date
12/31/2009
 
Notice Type
Presolicitation
 
NAICS
333923 — Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
 
Contracting Office
US Army Engineer District, Walla Walla, 201 N. Third Avenue, Walla Walla, WA 99362-1876
 
ZIP Code
99362-1876
 
Solicitation Number
W912EF-10-R-0015
 
Response Due
2/15/2010
 
Archive Date
4/16/2010
 
Point of Contact
Nona Fincher, 509-527-7218
 
E-Mail Address
US Army Engineer District, Walla Walla
(nona.r.fincher@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
The work shall consist of providing a new 40-ton tailrace gantry crane to be erected on the Ice Harbor Powerhouse tailrace deck. Electrical work for the replacement of the tailrace crane includes providing new operator controls, electrical equipment, and power supply system; this work will include fabrication, factory testing, and field-testing of electrical and control equipment. The electrical equipment and associated systems include motors, drives, brakes, limit switches, complete control systems including radio control, power supply system, conduit, wiring, load cells and indication, and auxiliary devices required to operate the cranes electrical power, lighting, and control systems. Mechanical and structural work for the replacement of the tailrace crane includes providing a new gantry crane which consists of a gantry frame with a trolley and gantry drives. The trolley will have a 40 ton hoist utilizing two load blocks, trolley drives and a trolley enclosure. The operators cab will be suspended underneath the trolley. The Contractor shall engineer and design all new components of the system and submit computations and drawings for approval. The design engineer for all calculations and drawings shall be a registered professional engineer. The tailrace crane shall be shop assembled, inspected and tested to verify that it meets all requirements before shipping to the site. The tailrace crane shall be erected, inspected, tested and certified at the rated capacity. Personnel training shall be conducted by the Contractor. In addition, the existing lifting beam will be retained and used by the new crane. After the new crane is accepted, the existing crane shall be removed from the site and disposed of in a legal manner. The paint system on the existing crane and lifting beam has a primer containing red lead. The crane will also be assumed to have asbestos in the electrical wiring, on the brakes and in the cab wall panels. All lead and asbestos abatement, containment and disposal incidental to on-site demolition activities shall be as specified. Spray painting on the new crane shall not be performed at the Project. The contractor shall be responsible for the preparation of the schedule and all required updating (activity status) and preparation of reports. The contractor shall have previously developed, created, and maintained at least three (3) electronic schedules for projects similar in nature and complexity to this project and shall be experienced in the use of the scheduling software. A Site Safety and Health Officer (SSHO) shall be provided at the work site at all times during on-site activities to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (QC) person cannot be the SSHO on this project. The SSHO shall have a minimum of three (3) years safety work on similar project, a 30-hour OSHA construction safety class or equivalent within last 3 years, and Competent Person Training as needed. The Government may use the Resident Management System for Windows (RMS) to assist in its monitoring and administration of this contract. The Contractor will use the Government-furnished Construction Contractor Module of RMS, referred to as QCS, to record, maintain, and submit various information throughout the contract period. The Contractor shall be responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements. The system shall cover all off-site fabrication and on-site installation operations
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA68/W912EF-10-R-0015/listing.html)
 
Place of Performance
Address: Ice Harbor Dam 2763 Monument Dr Burbank WA
Zip Code: 99323-8662
 
Record
SN02033827-W 20100102/091231234537-656c5e191084f1c3ee51f0f7559dc039 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.