Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 01, 2010 FBO #2960
SOURCES SOUGHT

69 -- Combined Arms Command and Control Trainer Upgrade System

Notice Date
12/30/2009
 
Notice Type
Sources Sought
 
NAICS
541512 — Computer Systems Design Services
 
Contracting Office
M67854 MARINE CORPS SYSTEMS COMMAND Quantico, VA
 
ZIP Code
00000
 
Solicitation Number
M6785406C8051
 
Response Due
1/30/2010
 
Archive Date
2/28/2010
 
Point of Contact
Janet Fondriest 407-380-8454
 
Small Business Set-Aside
N/A
 
Description
The Program Manager, Training Systems, Marine Corps Systems Command, Orlando, FL desires to increase, without full and open competition, the contract ceiling of contract M67854-06-C-8051, awarded to Cole Engineering Services Inc. (CESI), 3361 Rouse Road, Suite 215, Orlando, FL 32817-2136. This action is to increase the current ceiling by $4.9M from a total contract amount of $29.6M to a new contract amount of $34.5M. The current contract was a sole-source award to CESI, due to their unique technical knowledge and experience for the continued development and initial delivery of the Combined Arms Command and Control Trainer Upgrade System (CACCTUS). CESI's ongoing experience and intimate knowledge of the CACCTUS system and it's many components makes it's solely qualified to meet rigid FY10 programmed deliveries. The object of this modification is to complete development, design, integration, and test efforts to meet system capability and training requirements as defined in the Increment I CACCTUS Capabilities Design Document (CDD). This includes the development and delivery of CACCTUS version 5.2 in October 2010. Version 5.2 includes integration of and modifications to OneSAF version 3.0.6 as well as integration and fielding of a new 3D viewer, additional C4 integration, CACCTUS specific GUI enhancements, updated terrain databases and a host of other enhancements to functionality. This effort also requires the developer to complete initial equipment delivery to the remaining three sites (Camp Pendleton CA, MCB Hawaii, and Okinawa Japan). The contractor will integrate, test, and deliver to all three sites, a CACCTUS system with current versions of the CACCTUS software. Contractor will also deliver and install version 5.2 to all five sites once approved by the government. Delivery schedule and locations will be determined during IPT sessions following contract modification; however all deliveries must occur within the current period of performance, ending on 26 July 2011. A follow-on contract for further development in order to meet Final Operational Capability (FOC) and sustainment of the system is anticipated in FY11 using full and open competition.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/USMC/M67854/M6785406C8051/listing.html)
 
Record
SN02032875-W 20100101/091230234808-1f4b660ff137930fd043a805b449870d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.