MODIFICATION

C -- A-E IDIQ CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES, VARIOUS LOCATIONS, GUAM, M.I.

Notice Date
11/24/2009
 
Notice Type
Modification/Amendment
 
NAICS
541330 — Engineering Services
 
Contracting Office
N40192 NAVFAC MARIANAS PSC 455, BOX 195 FPO AP Santa Rita, GU,
 
ZIP Code
00000
 
Solicitation Number
N4019210R0001
 
Response Due
12/18/2009
 
Archive Date
1/2/2010
 
Point of Contact
DANTE P. SERNEO 671-339-8098 DORIS R. CASTRO, 671-339-8465
 
E-Mail Address
dante.serneo@fe.navy.mil
(dante.serneo@fe.navy.mil)
 
Small Business Set-Aside
N/A
 
Description
Amendment 1: The pre-solicitation notice issued on October 21, 2009 is modified to include the following: 1. Replace Selection Criterion 1 in its entirety with the following: (1) Specialized recent experience and technical competence of firm or particular staff members proposed for construction management services of new infrastructure, and alteration, renovation and repair type projects. Firm's demonstrated recent experience with regard to construction management services of base facilities similar in size, complexity, and dollar value. Base facilities include, but are not limited to, single or multi-story buildings, high bay structures, masonry, concrete steel, and pre-engineered structures; barracks and dormitory buildings, administrative facilities; educational facilities, libraries, medical facilities, dining facilities; industrial/warehouse facilities; waterfront facilities (piers and wharves); and aircraft facilities (including hangars and aprons), site utilities and infrastructure; ranges and operational/training facilities. Individual features (barracks, dormitories, administrative facilities, fire/police stations, etc.) do not have to be within a single project scope; however, projects that contain several or all features will be evaluated more favorably than projects that contain only individual features. Also, projects designed and constructed in environments similar to Guam (remoteness, corrosiveness, and seismic zone) will be considered more favorably. Describe a maximum of ten (10) relevant projects completed in the past ten (10) years which best describe experience in construction management services of the projects discussed above. A project or contract is defined as either a stand-alone contract or a single task order, or an accumulation of related task orders under the same IDIQ contract having the features described above. 2. Replace Selection Criterion 2 in its entirety with the following: (2) Professional qualifications of firm and staff proposed for construction management services of new infrastructure, and alteration, renovation and repair of existing infrastructure type projects. Key personnel are identified as the program managers or project managers that will manage the construction management services described in the contract scope. Provide up to five key personnel deemed by the firm to be most important to the success of the team. 3. Reduce the minimum order limit from $25,000 to $10,000. 4. Amend the statement regarding the selected firm, its subsidiaries or affiliates that design or prepare specifications for a construction contract cannot provide the construction services for the same contract to read as follows: The selected firm, its subsidiaries or affiliates that design or prepare specifications for a construction contract cannot provide the construction management services sought under this synopsis in relation to those construction contracts on which they provided design and specification preparation services unless such work is: 1) consistent with any organizational conflict of interest provisions in the contract under which such work was performed; and 2) performed under conditions that fully mitigate any potential organizational conflicts of interest. Design and specification preparation services includes concept design, which includes preparation of project programming documents (DD1391), facility siting studies, environmental assessments, or other activities that result in identification of project scope and cost. 5. Offerors shall submit an Organizational Conflict of Interest mitigation plan if the firm, its subsidiaries or affiliates have access to non-public information as part of its performance of a government contract that may provide an unfair competitive advantage in this competition of the Construction Management Services contract. Additionally, the offeror shall provide a mitigation plan that clearly addresses the potential conflicts and remedies any potential bias or impaired objectivity that may arise in providing the construction management services outlined in this synopsis. 6. Submissions of Standard Form 330 must be received and date/time stamped by the Contracting Officer on or before December 18, 2009 at 4:30 p.m. (Guam Time) in order to be considered. Any submission received after this date and time will not be considered. 7. Attached Notice 1 is provided in response to requests for information.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62766/N4019210R0001/listing.html)
 
Record
SN02010137-W 20091126/091124234659-0f557a59f1af7910d7684c07667f872c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.