Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 02, 2009 FBO #2869
AWARD

Z -- RECOVERY--Z--RECOVERY-Z Repair Storm Sewer - Lumpkin to Yeager

Notice Date
9/30/2009
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US Army Corps of Engineers, Savannah, P.O. Box 889, Savannah, GA 31402-0889
 
ZIP Code
31402-0889
 
Solicitation Number
W912HN-07-D-0024-SH-00586-8J
 
Response Due
8/12/2010
 
Archive Date
10/11/2010
 
Point of Contact
Debbie J. Payton-Thornton, 912-652-5076
 
E-Mail Address
US Army Corps of Engineers, Savannah
(debbie.j.payton-thornton@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912HN-07-D-0024-0034
 
Award Date
9/30/2009
 
Awardee
Atlantic Marine Construction Company Inc (DUNS - 602900052)<BR>3465 Chandler Creek Road<BR>Virginia Beach, VA 23453-2885
 
Award Amount
516,623.77
 
Line Number
1
 
Description
Project Number -33116 RECOVERY - PER 5.7 THIS IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Atlantic Marine Contruction Company - W912HN-07-D-0024. PROJECT INFORMATION: The work shall consist of the following: Perform detailed topographic survey to include storm water structure inverts and location of affected structures. Locate all utilities that will affect the project. Installation of silt fence, sediment traps and other erosion control devices. Provide for temporary traffic lights, signs and traffic safety devices for detours. Provide for temporary fencing and barriers to protect trenching and excavation activities and control access to construction site. Provide temporary gravel parking for buildings that will be affected by the excavation and installation of the storm water structures in their parking lots. Saw cut and replace all asphalt, striping, sidewalks, concrete aprons, curb and gutter and other concrete or asphalt structures that lies in the path of the storm water project. Replace all undersized corrugated pipe and RCP with newly sized RFP. Replace all old vertical storm water system structures with reinforced concrete. Install and/or replace all inlets, catch basins, manholes, headwalls, outlet structures and other storm water structures to meet new storm water plan.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/W912HN-07-D-0024-SH-00586-8J/listing.html)
 
Record
SN01975649-W 20091002/091001000551-58fb81b7ae44a552c3de34c2bfc3b876 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.