FBO DAILY ISSUE OF SEPTEMBER 24, 2009 FBO #2861
MODIFICATION

70 -- SERVER BLADE FARM

Notice Date
9/22/2009
 
Notice Type
Modification/Amendment
 
NAICS
423430 — Computer and Computer Peripheral Equipment and Software Merchant Wholesalers
 
Contracting Office
Executive Office of the President, Office of Procurement, Office of Procurement, 725 17th Street, NW, Room 5002, Washington, District of Columbia, 20503
 
ZIP Code
20503
 
Solicitation Number
OND-GEN-R-09-0093
 
Archive Date
9/24/2009
 
Point of Contact
Lynnae C. Roscoe, Phone: 202-395-7670, Brenda B. Spriggs, Phone: 202-395-7669
 
E-Mail Address
lynnae_c._roscoe@oa.eop.gov, bspriggs@oa.eop.gov
(lynnae_c._roscoe@oa.eop.gov, bspriggs@oa.eop.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Solicitation # OND-GEN-R-09-0093 is amended to extend the time for receipt of quotes to 5:00 pm, ET, September 23, 2009. See responses to the following questions. 1. How many chassis? Answer: Total of 2 Chassis 2. How many blades per chassis? Answer: 6 blades per chassis 3. What is the exact configuration of each blade Answer: CPU Dual/Quad-Core Xeon 5000 Server Module containing the following: 2 Intel Xeon Quad-Core E5450 3.0G/12MB/1333Mz/LGA771 2 OEM CPU Passive Heatsink for Dual Core Xeon 8 DDR2 PC2-5300 (667Mhz) Full Buffered/ECC DIMM Total of 4GB 4. How many network ports are required for each blade Answer: 2 (Uses switch integrated in Chassis) 5. What type of network ports? Answer: Gigabit Ethernet 6. How many Fiber Channel ports are required for each blade? Answer: 2 per Chassis (not per blade) 7. What are the storage requirements Answer: 14 300gb Hard Drives per Chassis total of 4.2Tb 8. Should all blades have equal access to all storage Answer: Yes, a ll blades MUST have equal access to all storage! 9. Should the storage be external, like on a SAN or network attached? Answer: No, a ll Storage MUST be contained in the Chassis 10. What are the exact requirements of the EACH blade chassis? Answer: 2 Dual-Core Xeon 5000 6U Rack 6bld14SAS/SMM/SCM/Sw (19' rack mountable) 2x 1000W Power Supply modules (included) 1 Gbit Ethernet Switch Module (included) 1 Server Management Module (included) 1 Shared LUN Feature Activation Key (MFSLUNKEY) 1 Storage Control Module SAS RAID (included) 1 Rack Mounting Rail Kit for BAR-056 (tool-less) 3 1000W Power Supply module 2 Gbit I/O Mezzanine card (3 pack) 6 2 CPU Dual/Quad-Core Xeon 5000 Server Module 12 Intel Xeon Quad-Core E5450 3.0G/12MB/1333Mz/LGA771 12 OEM CPU Passive Heatsink for Dual Core Xeon 48 4.0GB DDR2 PC2-5300 (667Mhz) Full Buffered/ECC DIMM 14 300GB SAS 2.5in Hard Drive SAS/6Gb /10Krpm/16MB 1 RAID 1 (Mirroring) Configuration 2 RAID 5 (Striping w/Distributed Parity) Config 1 Storage Control Module SAS RAID 0,1,1E,5,6,10,50,6 1 * No Monitor Installed 1 10 port Gbit Ethernet Switch Module 1 * No Operating System Installed 1 3Yr P&L, Next Day Parts, On Site Service 1 Toll-Free Technical Support 11. Can you please verify these two server blades are going to be fully configured and if they are what is the configuration they are looking for (raid etc.)? Answer: To clarify, these are not two server blades. These are two Blade Farms that are fully configured. As listed in the specifications, items that contains 6 blade servers each, that contains fully shared and raided drives accessible to ALL of the blades in the unit. 12. Are you looking for 2 completed fully intergraded Intel Modular Server (IMS).? Answer: yes 13. Each Complete IMS must have 4 PSU instant of 2 PSU. If one fails the other will take the place (redundancy) Answer: Yes, minimum 3 PSUs to power full pillar, with 1 failover (we requested 5 for each pillar (giving us one for a spare). 14. Each Complete (Fully integrated )IMS must have 2x Storage Controller. If one fails the other will take the place (redundancy) Answer: Correct 15. Each complete (Fully intergraded) IMS must have 2x Ethernet Switch Module. If one fails the other will take the place (Redundancy) Answer: Correct 16. When reviewing your request, the PSU only need 2, the Ethernet Switch only have 1 (which included) and 1x Storage Controller (which is included), when you have a fully completed (6 compute modules) it requires all the redundancy. Answer: 4 PSUs are required per blade farm, plus one as a "hot" back-up in case for failure for a total of 5 PSUs for each of the 2 blade farms requested. See lines 3 and 9 under (vi) of the RFQ. The rest is correct.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/EOP/OP/WashingtonDC/OND-GEN-R-09-0093/listing.html)
 
Place of Performance
Address: 750 17th Street, NW, Washington, District of Columbia, 20503, United States
Zip Code: 20503
 
Record
SN01965377-W 20090924/090923001407-bf42b08565da85db91337eddaa1519ad (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.