FBO DAILY ISSUE OF SEPTEMBER 20, 2009 FBO #2857
MODIFICATION

54 -- RECOVERY--54--RECOVERY-- PROJECT NUMBER 007090, YAZOO BASIN, GRENADA LAKE, MS -- Furnish, Deliver, and Install One Boat Storage Building at the Grenada Lake Shop Area in the State of Mississippi

Notice Date
9/18/2009
 
Notice Type
Modification/Amendment
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
US Army Corps of Engineers, Vicksburg District, ATTN: CEMVK-CT, 4155 Clay Street, Vicksburg, MS 39183-3435
 
ZIP Code
39183-3435
 
Solicitation Number
W912EE-09-T-0043
 
Response Due
9/23/2009
 
Archive Date
11/22/2009
 
Point of Contact
Anitra Wilson, 601-631-5341
 
E-Mail Address
US Army Corps of Engineers, Vicksburg District
(anitra.d.wilson@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
RECOVERY--The required response date/time has been changed from 18 September 2009 to 23 September 2009 not later than 4:30 p.m. Effective with this amendment, the following is added to this solicitation: EM 385 1 1, SAFETY AND HEALTH REQUIREMENTS. Contractors are required to comply with the latest version, and all posted changes, of the U.S. Army Corps of Engineers Safety and Health Requirements Manual. EM 385-1-1 and changes are available on the Internet at http://www.hq.usace.army.mil. FAR Clause 52.228-5, Insurance -- Work on a Government Installation, is applicable to this solicitation. The following questions and answers are provided for informational purposes only: Question #1: Are we to install additional footings in place of the ones we are removing? Answer #1: The existing concrete is to be broken out and install (18) 2'x2'x1' concrete footings with 12 in. stem. The concrete is to be taken out only where these footings will be placed. There is a diagram of the footings on page 6 of the specs titled Footing Detail. Question #2: The Delivery and Installation time of 1 Oct 2009 15 Oct 2009 may not be able to be obtained do to the time it take to approve the drawings and manufacture the building can take form 5 to 6 weeks from approved drawings. Can the delivery time be changed to on or before 12/31/2009? Answer #2: The Delivery and Installation has been changed to a completion date of Not Later Than 31 Dec 09. The delivery and installation shall be coordinated with government personnel. The proposed delivery and installation shall be indicated on your quote. See the revised General Information Sheet in Attachment 1. Paragraphs revised by this amendment have asterisks in the margin before and after changes to previous issue. Question #3: Could you please provide the street address of the location of the proposed boat storage building. Answer #3: The physical address for the Grenada Lake Field Office is as follows: 2202 Scenic Loop 333 Grenada, MS 38901
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA38/W912EE-09-T-0043/listing.html)
 
Place of Performance
Address: US Army Corps of Engineers, Vicksburg District ATTN: CEMVK-CT, 4155 Clay Street Vicksburg MS
Zip Code: 39183-3435
 
Record
SN01961063-W 20090920/090919000457-c08567911c0c67d48a7105094b17ea8b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)