Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 18, 2009 FBO #2855
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER RM09-1452, TAS::17 1805::TAS,FACILITY ENERGY IMPROVEMENTS (PHASE 3-HVAC), NAVAL BASE PT. LOMA.

Notice Date
9/16/2009
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
N62473 NAVFAC SOUTHWEST, POINT LOMA FEAD/CODE ROPML Naval Base Point Loma 4635 Pacific Highway San Diego, CA
 
ZIP Code
00000
 
Solicitation Number
N6871103D7004X090
 
Response Due
8/20/2009
 
Archive Date
10/15/2009
 
Point of Contact
ROD CATABAY, CONTRACT SPECIALIST, 619-524-3150 - rodrigo.catabay@navy.mil
 
Small Business Set-Aside
N/A
 
Award Number
N6871105D4011 0019
 
Award Date
9/15/2009
 
Awardee
SOUZA CONSTRUCTION, INC. (DUNS 179582440) (DUNS 179582440)586 S. FARMERSVILLE BLVDFARMERSVILLE, CA 93223-2040
 
Award Amount
1,063,400.45
 
Line Number
0001
 
Description
RECOVERY-- PROJECT NUMBER RM09-1452, FACILITY ENERGY IMPROVEMENTS (PHASE 3-HVAC), NAVAL BASE PT. LOMA. PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTORS UNDER CONTRACT N68711-03-D-7004, IDIQ MACC FOR NEW CONSTRUCTION AND REPAIR BY DESIGN-BUILD OR (TO A LESSER EXTENT) DESIGN-BID-BUILD OF HEATING, VENTILATION, AIR-CONDITIONING (HVAC)SYSTEMS CONSTRUCTION, REPAIRS, MAINTENANCE AND ASSOCIATED WORK AT VARIOUS LOCATIONS WITHIN THE SOUTHWEST DIVISION AREA OF RESPONSIBILITY, INCLUDING BUT NOT LIMITED TO ARIZONA, CALIFORNIA, NEVADA, AND NEW MEXICO. THE MACC CONTRACTORS LISTED ON THIS MACC GROUP 0032 ARE AS FOLLOWS: BESTEK ENGINEERING, INC., LOS ANGELES, CA,N6871105D4009; SOUZA CONSTRUCTION, INC., FARMERSVILLE, CA,N6871105D4011; SUN MECHANICAL COMPANY, CITY OF INDUSTRY, CA,N6871105D4008. THE WORK TO BE PERFORMED INCLUDES DEMOLITION AND REINSTALLATION OF 62 HVAC PACKAGE ROOFTOP UNITS ON 11BUILDINGS. IT ALSO INCLUDES DEMOLITION AND REINSTALLATION OF CONTROLS ON APPLICABLE ROOFTOP UNITS, POWER CONTROL BOXES, REPLACEMENT OF THERMOSTATS, AND UPDATING/REPLACEMENT OF ROOF CURBS. THE GOVERNMENT EVALUATED PROPOSALS AND AWARDED WITHOUT DISCUSSIONS. SELECTION FOR AWARD WAS BASED ON EVALUATION OFTHE FOLLOWING: FACTOR 1-SCHEDULE, AND FACTOR 2-PRICE. AWARD WILL BE MADE TO SOUZA CONSTRUCTION, INC. UNDER CONTRACT NUMBER N68711-05-D-4011-0019.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711A5/N6871103D7004X090/listing.html)
 
Record
SN01958257-W 20090918/090917001959-5a7e093ca1c39c7ae92637a0006a7e7d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.