Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 16, 2009 FBO #2853
AWARD

Y -- RECOVERY--Y--RECOVERY--PROJECT NUMBER 104781, TRES RIOS, AZ

Notice Date
9/14/2009
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US Army Corps Of Engineers, Los Angeles, P.O. Box 532711, Los Angeles, CA 90053-2325
 
ZIP Code
90053-2325
 
Solicitation Number
W912PL-08-C-0011-P00009
 
Response Due
9/14/2009
 
Archive Date
11/13/2009
 
Point of Contact
Christina Chavez, (213)452-3246
 
E-Mail Address
US Army Corps Of Engineers, Los Angeles
(christina.chavez@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PL-08-C-0011-P00009
 
Award Date
9/11/2009
 
Awardee
Archer Western Contractors, LTD<BR>1951 W. Camelback Road, Suite 450<BR>Phoenix, AZ 85015-3474<BR>(DUNS NO 788714710)<BR>
 
Award Amount
805,718.37 Recovery, 239,749.00 Non-Recovery.
 
Line Number
7009
 
Description
PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE, FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR UNDER THE CURRENT CONTRACT NUMBER: ARCHER WESTERN, TRES RIOS, AZ Archer Western, W912PL-08-C-0011-P00009, Tres Rios, AZ, FUNDING MODIFICATION, Work Includes construction of an approx. 280-acre area of regulating wetlands including wetland cells with deep-water wetlands, emergent zones, vector control sites, hummocks and islands. It also includes construction of flow control structures, discharge structures, weir gates, spillways and other structures associated with measurement of chlorine residual and sodium sulfite and composite samples. In additional to those described above, construction of operation & maintenance roads, access ramps, landscaping and piping are needed for regulating wetlands to be functional. An approx. 2-mile long trapezoidal reinforced concrete channel will be constructed as part of wetlands protection features from flooding damage. Installation of four-wire right-of-way fence and gates, removal and disposal of debris and incidentals shall be done for the project. Earthwork consists of excavation, compacted fill and disposal of excess of unsuitable excavated material to optional disposal sites. Stone/Riprap work consists of installation along the fill/cut slopes of wetland features and flow control structure outlets.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA09/W912PL-08-C-0011-P00009/listing.html)
 
Record
SN01953469-W 20090916/090915000451-10f02db2b4f21803987f752b882e5d5a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.