FBO DAILY ISSUE OF AUGUST 14, 2009 FBO #2820
SOLICITATION NOTICE

62 -- ARRA - INSTALL LIGHTING / CONTROLS BLDG 750

Notice Date
8/12/2009
 
Notice Type
Presolicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, US Army Corp of Engineers - Alaska, ATTN: CEPOA-CT, P. O. Box 6898, Elmendorf AFB, Alaska, 99506-6898
 
ZIP Code
99506-6898
 
Solicitation Number
W911KB-09-T-0025
 
Archive Date
12/31/2009
 
Point of Contact
Olen R. Northern, Phone: 9077532525
 
E-Mail Address
olen.r.northern@usace.army.mil
(olen.r.northern@usace.army.mil)
 
Small Business Set-Aside
HUBZone
 
Description
FTR312 Title: ARRA- Replace lighting and install Controls, Bldg 750. Location: On D Street, Fort Richardson, Alaska 1. Scope: Replace existing lighting with quick start lighting fixture and related controls (switches, occupancy sensors, etc) to greatly improve lighting quality and allow occupancy sensor controls to reduce electricity use. 2. Required items to be included in the project: a. Material submittals: Yes, all electrical appurtenances. b. Shop Drawings: None required. c. A hazardous analysis: Not required. d. As Builts: Yes - Provide as built corrected drawings at the completion of the project and return disk to DPW prior to final payment. e. Quality Control is required during the performance of this work. Some particulars of the job will be: 3. There are no Government Furnished Materials. 4. For Security Requirements contact Sonny Turpin at (907) 384-3915 to coordinate site access. 5. For working hour restrictions contact Sonny Turpin at (907) 384-3915 to coordinate. 6. Completion date is 90 days from the notice to proceed. The entirety of Building 750 will be involved. The plan is to remove the existing HPS luminaires and install the Hi-bay fluorescents per sheet E-2. Building 750 interior dimensions are 360' x 67'. The existing luminaires to be replaced are 120v 400w High Pressure Sodium. The luminaires are wired into existing 120v outlets in the ceiling. The circuits will remain and the new luminaires will have a 120v plug wired in. Approx. 40 new outlets will need to be provided for the additional luminaires being installed. The height to the bottom of the steel trusses is approx. 14', the height to the ceiling is approx. 21' There is a total count of 80 HPS luminaires. Electrical as-builts are un-available for the installation and wiring of the existing HPS luminaires. Switches are to be placed in a single location at the entry door near the M5 Office and wire in additional night lights at (4) additional locations by each personnel doors. PDF versions of building diagrams are available by contacting olen.r.northern@usace.army.mil.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA85/W911KB-09-T-0025/listing.html)
 
Place of Performance
Address: D street, Building 750 Fort Richardson AK 99505, Fort Richardson, Alaska, 99505, United States
Zip Code: 99505
 
Record
SN01909121-W 20090814/090813000914-07ebb499a13b2eab83a51f789832bed5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.