Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 06, 2009 FBO #2812
MODIFICATION

99 -- Upcoming Deadlines and Site Visit

Notice Date
8/4/2009
 
Notice Type
Modification/Amendment
 
Contracting Office
Department of the Air Force, Air Mobility Command, 60th CONS, 350 Hangar Ave. Bldg 549, Travis AFB, California, 94535-2632, United States
 
ZIP Code
94535-2632
 
Solicitation Number
F3Z4539160AC01
 
Archive Date
9/4/2009
 
Point of Contact
Nancy J. Crowell, Phone: 7074247773
 
E-Mail Address
nancy.crowell@travis.af.mil
(nancy.crowell@travis.af.mil)
 
Small Business Set-Aside
N/A
 
Description
QUESTIONS AND ANSWERS FOR SOLICITATION F3Z4539160AC01 1.Can you give us more details about the RF testing? NO 2. When will study start and how long is it expected to last? VENDORS DECISION 3.What the deliverables? EXPLANED IN SOW 4. What is the funding level? DO NOT KNOW THE ANSWER 5. Will DGMC plan on using a 802.11n services if so, there are many more options than the solution depicted in the RFP. NO 6. If a problem were to happen with wireless access points or RF connectivity issues, DGMC will have to go back to the Vendor who installed the proposed solution. Is DGMC looking for only one vendor to do the survey, install and maintenance of this infrastructure? NO 7. Also would like to clarify that the SOW for this project is a survey and design only. (That is what the posted SOW is asking for) and NOT a turn key solution. THIS IS NOT A TURN KEY SOLUTION 8. The solicitation indicates that the "David Grant Medical Center (DGMC) requests a survey to design a fully engineered, broadband, passive, in-building distributed antenna system." Will the contracted vendor be required to only "survey" existing system coverage... NO 9. Will the contracted vendor be required to only "survey" existing system coverage to show dead spots, or "design" a revised system by selecting antenna sites, operating parameters, etc.? YES 10 If the DGMC requests a complete system design, to what extent of a design will be required? DO NOT UNDERSTAND THE QUESTION, PLEASE BE MORE SPECIFIC 11. Will the design be limited to theoretical transmitter locations, or will it also include equipment and antenna selection, site surveys, system wiring and power requirements, etc. What will be the full scope of the requested design? DO NOT UNDERSTAND THE QUESTION, PLEASE BE MORE SPECIFIC 12. The solicitation indicates that the system must be designed for the transmission of multiple radio frequency (RF) signals simultaneously covering all radio frequencies from 150 MHz to 6 GHz. Does this statement refer to a specific system distinct from the cellular, paging, and LMR systems further described in the solicitation? YES 13. If this is a distinct system, what is the broadband technology that will be employed? ANY TECHNOLOGY AVAILABLE AT THIS TIME 14. What specific band(s) will it operate in? 150 MHZ - 6 GHZ 15. Is there any existing infrastructure for such a system? NO 16. What are the desired capabilities of such a system? RF COVERAGE 17. Will the vendor be responsible for performing needs assessment and selecting a technology for this system? NO
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AMC/60CONS/F3Z4539160AC01/listing.html)
 
Record
SN01898349-W 20090806/090804235802-76cb86bf6d12988e03dde5b8e5c6aae6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.