Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 31, 2009 FBO #2804
AWARD

Z -- RECOVERY--Z--Upgrade Electrical Systems New Bedford, Hurricane Barrier.

Notice Date
7/29/2009
 
Notice Type
Award Notice
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U. S. Army Engineer District, New England, US Army Engineer District, New England, 696 Virginia Road, Concord, MA 01742-2751
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ-08-C-0006
 
Archive Date
9/18/2009
 
Point of Contact
elandria cameron, 9783188051<br />
 
E-Mail Address
US Army Engineer District, New England
(elandria.m.cameron@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912WJ-08-C-0006
 
Award Date
7/27/2009
 
Awardee
Watermark Environmental, Inc<BR>175 Cabot Street<BR>Lowell, MA 01854
 
Award Amount
218,954.44
 
Line Number
P00001
 
Description
Award of a contract to cut and remove 3 inches pavement in a 40' x 50' area adjacent to the Hurricane Barrier concrete structure. Mark and photograph the dike armor stone underlying arrangement(s). Remove armor stones above the underground conduit and set aside for replacement after repairs. Excavate to the underground conduit ductbank. Remove any damaged sections of 4 inches conduits and ductbank and replace with new Schedule 80 underground 4 inches conduits. Drill and insert four (4) #5 rebar dowels into the existing concrete of the hurricane barrier structure. Place new 5,000 psi concrete over new conduit to form a new section of duct bank 1'x1' in cross-section. Backfill and compact soil around the ductbank. Replace armor stones in same locations as was removed. Repave the exposed armor stone surface to match the grade of existing driveway and the hurricane barrier structure Also to remove 15 existing fender and sector gate lights and wiring materials on the New Bedford Hurricane Barrier Fairhaven side gate from fixture locations back to the junction box on the concrete abutment. Provide 16 new fender lights (McDermott Light Co., Part #9-9P-120-IL-12-.250-1PM-R or approved equal) with 1inches GVC covered steel pipe. Install 15 lights on the barrier gate with new conductors, conduit and stainless steel clamps from the junction box on the concrete abutments to each original light location. Provide remaining light fixture to the Government as spare parts.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA33/W912WJ-08-C-0006/listing.html)
 
Record
SN01892664-W 20090731/090730002444-a014f21aa622e3cecb6bb4b14581b0cf (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.