Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 24, 2009 FBO #2797
SOLICITATION NOTICE

W -- Light Towers

Notice Date
7/22/2009
 
Notice Type
Combined Synopsis/Solicitation
 
Contracting Office
Department of the Army, Army Contracting Agency, South Region, ACA, Fort Irwin, na, Ft. Irwin, CA 99999
 
ZIP Code
99999
 
Solicitation Number
NTC09-09-HIGG-01
 
Response Due
7/24/2009
 
Archive Date
1/20/2010
 
Point of Contact
Name: Client Services, Title: Sourcing Agent, Phone: 1.877.9FEDBID, Fax: 703.442.7822
 
E-Mail Address
clientservices@fedbid.com;
 
Small Business Set-Aside
Total Small Business
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, in conjunction with FAR 13.5, as applicable, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; bids are being requested and a written solicitation will not be issued. The solicitation number is NTC09-09-HIGG-01 and is issued as an invitation for bids (IFB), unless otherwise indicated herein. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-31. The associated North American Industrial Classification System (NAICS) code for this procurement is 532310 with a small business size standard of $7.00M. This requirement is a [ Small Business ] set-aside and only qualified offerors may submit bids. The solicitation pricing on www.FedBid.com will start on the date this solicitation is posted and will end on 2009-07-24 13:00:00.0 Eastern Time or as otherwise displayed at www.FedBid.com. FOB Destination shall be Multiple shipping information. The USA ACA Fort Irwin requires the following items, Brand Name or Equal, to the following: LI 001, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 25 July 2009 - 6 August 2009, then again on 22 August 2009 - 29 August 2009. Items will be delivered to the Movement Control Center (MCC) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 1, EA; LI 002, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 27 July 2009 - 3 September 2009. Items will be delivered to the Rotational Unit Bivuac Area (RUBA), AKA FOB Warrior, located on Fort Irwin. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 10, EA; LI 003, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 27 July 2009 - 6 August 2009, then again on 22 August 2009 - 29 August 2009. Items will be delivered to the Motor Pool located on Fort Irwin. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 14, EA; LI 004, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 27 July 2009 - 3 August 2009 for 25 Light Towers, then again on 22 August 2009 - 29 August 2009 for 5 Light Towers. Items will be delivered to the YERMO railhead location. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 25, EA; LI 005, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 25 July 2009 - 6 August 2009, then again on 22 August 2009 - 29 August 2009. Items will be delivered to Bicycle Lake located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 006, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to FOB King located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 20, EA; LI 007, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to FOB Seattle located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 20, EA; LI 008, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to FOB Denver located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 20, EA; LI 009, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to FOB Dallas located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 25, EA; LI 010, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to FOB Miami located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 25, EA; LI 011, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to AL-JAFF (JSS) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 012, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to Medina Jabal (JSS) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 013, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to Medina Wasal (JSS) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 014, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to Aber Layla (JSS) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 015, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to Al-Sharq (JSS) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 016, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 - 21 August 2009. Items will be delivered to Reno FARP (Live Fire Range) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide and all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 10, EA; LI 017, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 7 August 2009 and again from 21 August 2009 - 22 August 2009. Items will be delivered to "4 Corners" located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 2, EA; LI 018, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 29 July 2009 - 31 July 2009, then again on 23 August 2009 - 27 August 2009. Items will be delivered to the Ammo Supply Point (ASP) located within the Fort Irwin training area. Primary and backup generators shall be diesel/JP8 type. The equipment must withstand the rough high desert terrain of Fort Irwin. The equipment must withstand 70+mph wind gusts of the Fort Irwin high desert area. The contractor shall provide all necessary parts, equipment and maintenance necessary to assure proper and continuous, 24 hour, functioning of the equipment including weekends and holidays. The items must be delivered with full fuel tanks. The contractor must acknowledge all repair calls within four hours of initial call and complete all necessary repairs within 12 hours. Deliver/set-up/Removal fees are included in pricing., 4, EA; LI 019, Mobile Light Tower Rental Description: Light towers shall be mobile light towers that provide a minimum of 4,000 watts of light. Towers shall have metal-halide lamps powered by a minimum of 6,000 watt light tower generator. Light tower units shall be powered by dependable diesel engines with minimum 30-gallon fuel tanks for 68 hours of operation. 120v GFI, 240v twist, 360 tower rotation. Period of Performance (POP) is 31 July 2009 - 12 August 2009. The quantity will be 4 Light Towers from 31 -- Please refer to FedBid for complete list of contract requirement(s) and terms and conditions.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/DABK/DABK17/NTC09-09-HIGG-01/listing.html)
 
Place of Performance
Address: Multiple shipping information.<br />
Zip Code: Multiple<br />
 
Record
SN01883135-W 20090724/090722234814-58c9ad48bee3941dc53af2e7b6f05f41 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.