Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 11, 2009 FBO #2784
SOLICITATION NOTICE

A -- JP8 Fuel Cell Auxiliary Power Unit (APU) System

Notice Date
7/9/2009
 
Notice Type
Presolicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of the Army, U. S. Army Materiel Command, U.S. Army TACOM Life Cycle Management Command (Warren), TACOM - Warren Acquisition Center, ATTN: AMSTA-AQ-AMB, E Eleven Mile Road, Warren, MI 48397-5000
 
ZIP Code
48397-5000
 
Solicitation Number
W56HZV-05-R-BAA1-TOPIC21
 
Response Due
9/10/2009
 
Archive Date
11/9/2009
 
Point of Contact
Pamela J. Thornton, 586-574-7280<br />
 
E-Mail Address
TACOM - Warren Acquisition Center
(pamela.j.thornton@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Under this topic, the Government invites proposals to develop a fuel cell based auxiliary power unit (APU) that operates off 100% JP-8 Army logistic fuel (MIL-STD-83133F2); no blended fuels. The system developed shall include a DC/DC converter whose output is connected to the vehicle DC bus, to which the vehicle battery and alternator are also connected. The system must be water neutral; meaning all water requirements for the system (if any) must be met by internal water recovery with no external sources. The system must meet the specifications in identified in the topic itself and be at Technology Readiness Level (TRL) 5 by program end. The Government anticipates this APU to be used on multiple platforms, such as Abrams, Bradley, Medium Tactical Vehicle and/or future vehicles. The expected program duration is 36 months. This topic contains three option requirements. Upon successful completion of the initial program, one or more of three options may be exercised for an additional 12 to 36 months. FUNDING: The Government anticipates awarding up to 2 contracts. Funding is estimated at $5.25M per contract over three years for the base award. OPTIONS: Option 1: Funding is estimated at $8M per contract over three years. Option 2: Funding is estimated at $5.25M per contract over three years. Option 3: Funding is estimated at $300Kper contract over one year. Potential offerors should access the full topic description by clicking the link below or copying and pasting the following URL: http://contracting.tacom.army.mil/baa/05RBAA1/topics.htm Solicitation terms and conditions and proposal submission instructions for this Broad Agency Announcement can be accessed by copying and pasting the following URL: http://contracting.tacom.army.mil/baa/05RBAA1/05RBAA1.htm Special Proposal Instructions: PROPOSALS THAT REFLECT A PARTIAL TECHNICAL SOLUTION TO THE TECHNICAL OBJECTIVES, INCLUDING ALL OPTIONS, ARE NOT ACCEPTABLE. THE GOVERNMENT WILL CONSIDER ONLY THOSE PROPOSED PROJECTS THAT ADDRESS ALL ELEMENTS OF THE OBJECTIVE. All proposals are due no later than 3:00 P.M. Local Time, September 10, 2009 using the ASFI Bid Response System (BRS), which may be accessed at https://acquisition.army.mil/asfi/default.cfm. You will find Topic 21 for proposal submission by searching Contracting Opportunities for 'TARBAATOPIC21.' As reflected by the results of this search, proposals for Topic 21 may be uploaded via the ASFI BRS at the following URL: https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=TARBAATOPIC21
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/USAMC/DAAE07/W56HZV-05-R-BAA1-TOPIC21/listing.html)
 
Place of Performance
Address: TACOM - Warren Acquisition Center ATTN: AMSTA-AQ-AMB, E Eleven Mile Road Warren MI<br />
Zip Code: 48397-5000<br />
 
Record
SN01869603-W 20090711/090709235117-d59318da37df25d0d23e42aa81174fc0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.