SOLICITATION NOTICE
Y -- Recovery - CO RRP MOVI 10(2), Auto Tour Road
- Notice Date
- 5/11/2009
- Notice Type
- Synopsis
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 12300 West Dakota Avenue Lakewood CO 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-09-B-00027
- Response Due
- 7/23/2009
- Archive Date
- 9/25/2009
- Point of Contact
- Tiffany C Atchison, Phone 720-963-3354, Fax 720-963-3360, - Brenda J McGehee, Contract Specialist, Phone 7209633353, Fax 7209633360
- E-Mail Address
-
tiffany.atchison@fhwa.dot.gov, brenda.mcgehee@fhwa.dot.gov
- Small Business Set-Aside
- Total HUB-Zone
- Description
- This project will be advertised as a HUBZone Small Business Set Aside. The project is located in the Monte Vista National Wildlife Refuge, approximately 6 miles south of the town of Monte Vista, CO. The project work is on Route 10, Auto Tour Route, and is a one way loop road. Route 10 is flat and devoid of hilly terrain. Elevation is approximately 7,600 ft. The major project work consists of regraveling the 2.45 mile road that includes minor widening and alignment adjustment, parking area (existing and new pullouts) improvements, and minor drainage improvements. The rehabilitation work will require excavation and embankment construction. The road will be excavated to a depth of 4 inches and replaced with 5 inches of roadway aggregate. The excavated material will be used to build the pullouts along with additional fill material. One isolated section of road (approx. 3,500 ft) will have a slight alignment shift. The parking area work includes the rehabilitation of 3 existing parking areas (approx. 3,500 to 4,500 sqft) and the construction of 6 new ones (approx. 400 to 3,000 sqft). There are 4 culvert replacements with one containing a simple irrigation control structure. Other minor work consists of roadway obliteration and turf establishment. The road improvements are based on resource grade GPS data and no survey data will be provided. The Contractor is responsible to perform survey and staking as needed outlined in the contract specifications to carry out the rehabilitation work described in the plans. This work is a one season project with an estimated duration of 3 months. It is anticipated that the project will be begin late July 2009 and completed in late October 2009. The estimated price range for this project is between $500,000 and $1 million. The tentative advertisement date is June 15, 2009. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (11-MAY-2009); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-09-B-00027/listing.html)
- Place of Performance
- Address: Monte Vista National Wildlife Refuge Monte Vista, CO
- Country: US
- Country: US
- Record
- SN01813723-F 20090513/090511233014 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |