DOCUMENT

59 -- Cable 6 Upgrade - Cable 6 Upgrade

Notice Date
12/12/2008
 
Notice Type
Cable 6 Upgrade
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Navy, Bureau of Medicine and Surgery, NMLC, 1681 Nelson St, FT Detrick, Maryland, 21702-9203
 
ZIP Code
21702-9203
 
Solicitation Number
N62645-09-T-0038
 
Archive Date
1/1/2009
 
Point of Contact
Jaime R Layton,, Phone: 301-619-3020
 
E-Mail Address
jaime.layton@med..navy.mil
 
Small Business Set-Aside
N/A
 
Description
Federal Business Opportunities Announcement The Naval Medical Logistics Command intends to negotiate with vendors on an open competition basis to procure a CAT 6 Upgrade for the NOSTRA facility in VA. Interested parties shall attend a walk through on 19 December 2008 at 11:00 a.m. EST if possible, and if not 22 December 2008 at 8:00 a.m. Submit a proposal and technical documentation within 10 business days. The technical documentation will be compared to the essential minimum salient characteristics and the evaluation factors listed below. Salient Characteristics: 1. NOSTRA would like to have the current CAT 3, 5, & 5e network cable, throughout the 41,000 sq.ft. building replaced with CAT 6 cabling including the upgrade of existing switch cabinets. The recently installed CAT 6 will remain in place and untouched by the contractor unless otherwise specifically asked by NOSTRA. 2. NOSTRA expects the contractor to take all steps necessary to minimize those inconveniences to all NOSTRA employees. 3. All cabling shall be installed in a manner of which visual sight of the cabling will be minimal. If keeping the cable from being seen visually is not feasible, then the contractor should make every effort to install the cable in such a manner that it be as visually aesthetic as possible. 4. NOSTRA is seeking the ability to communicate throughout the Local Area Network at a minimum of speed of 1Gbps. 5. The contractor shall include descriptions of any previously completed work similar in size and scope of work, to demonstrate expertise. 6. The contractor shall pull, terminate, test, and certify Yellow CAT 6 cabling rated for at least 550Mhz. 7. Priority will be given to using power poles that are already provided and where necessary contractor will provide any additional power poles, locking channel conduit, and surface raceways. 8. Contractor will remove and properly dispose of existing CAT 3, 5, & 5e cabling and switches to include the patch panel inside current secure area. This will be done in accordance with state and federal regulations once CAT 6 cabling is installed and employees are no longer connected to and using old cabling. The objective is to provide for minimum impact on NOSTRA employees by having the CAT 6 cabling installed along side the existing cabling and switched over to the CAT 6 cabling before the old cabling is removed. 9. Installation of CAT 6 patch panel for drops plus patch cables from patch panel to switch. 10. Patch cables will consist of varying lengths from the patch panels to the switches. The contractor shall use cable management techniques to provide for a neat fit and finish appearance. 11. The new and old cables must be secured, labeled and organized in such a way that their identity could be easily determined by NOSTRA staff to include recently installed CAT6. 12. All drops shall use CAT 6 compliant jacks. 13. Cabling routed through plenum areas must be plenum compliant and jacketed with low-smoke PVC. 14. All additional components should be mounted to fit and provide a clean fit and finish to the whole project. 15. Evaluation Criteria: The Naval Medical Logistics Command intends to negotiate with vendors on an open competition basis for a CAT 6 upgrade for NOSTRA. Technical proposals must include sufficiently detailed information to enable evaluation based on four (4) factors listed below in order of decreasing priority: 1.) Equipment Factors; Conformance to Essential Characteristics and Standardization; 2.) Human Factors; a.) Simplicity; b.) Ease of Use; 3.) Quality; a.) Warranty; b.) Parts Availability; c.) Parts Cost; d.) Serviceability 4.) Instruction Materials; a.) Operator’s Manual; b.) Maintenance Manual Regulatory Requirements: Emphasis should be made to make sure that the installation complies with all industry standards, and any and all regulations both state and federal. Essential Characteristics CAT 6 System Installation/Upgrade 1. NOSTRA would like to have the current CAT 3, 5, & 5e network cable, throughout the 41,000 sq.ft. building replaced with CAT 6 cabling including the upgrade of existing switch cabinets. The recently installed CAT 6 will remain in place and untouched by the contractor unless otherwise specifically asked by NOSTRA. 2. NOSTRA expects the contractor to take all steps necessary to minimize those inconveniences to all NOSTRA employees. 3. All cabling shall be installed in a manner of which visual sight of the cabling will be minimal. If keeping the cable from being seen visually is not feasible, then the contractor should make every effort to install the cable in such a manner that it be as visually aesthetic as possible. 4. NOSTRA is seeking the ability to communicate throughout the Local Area Network at a minimum of speed of 1Gbps. 5. The contractor shall include descriptions of any previously completed work similar in size and scope of work, to demonstrate expertise. 6. The contractor shall pull, terminate, test, and certify Yellow CAT 6 cabling rated for at least 550Mhz. 7. Priority will be given to using power poles that are already provided and where necessary contractor will provide any additional power poles, locking channel conduit, and surface raceways. 8. Contractor will remove and properly dispose of existing CAT 3, 5, & 5e cabling and switches to include the patch panel inside current secure area. This will be done in accordance with state and federal regulations once CAT 6 cabling is installed and employees are no longer connected to and using old cabling. The objective is to provide for minimum impact on NOSTRA employees by having the CAT 6 cabling installed along side the existing cabling and switched over to the CAT 6 cabling before the old cabling is removed. 9. Installation of CAT 6 patch panel for drops plus patch cables from patch panel to switch. 10. Patch cables will consist of varying lengths from the patch panels to the switches. The contractor shall use cable management techniques to provide for a neat fit and finish appearance. 11. The new and old cables must be secured, labeled and organized in such a way that their identity could be easily determined by NOSTRA staff to include recently installed CAT6. 12. All drops shall use CAT 6 compliant jacks. 13. Cabling routed through plenum areas must be plenum compliant and jacketed with low-smoke PVC. 14. All additional components should be mounted to fit and provide a clean fit and finish to the whole project. 15. Evaluation Criteria: The Naval Medical Logistics Command intends to negotiate with vendors on an open competition basis for a CAT 6 upgrade for NOSTRA. Technical proposals must include sufficiently detailed information to enable evaluation based on four (4) factors listed below in order of decreasing priority: 1.) Equipment Factors; Conformance to Essential Characteristics and Standardization; 2.) Human Factors; a.) Simplicity; b.) Ease of Use; 3.) Quality; a.) Warranty; b.) Parts Availability; c.) Parts Cost; d.) Serviceability 4.) Instruction Materials; a.) Operator’s Manual; b.) Maintenance Manual
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=ae1cbf03429577dba1b6b226a1af1904&tab=core&_cview=1)
 
Document(s)
Cable 6 Upgrade
 
File Name: Request for Quote (N62645-09-T-0038.doc)
Link: https://www.fbo.gov//utils/view?id=02d1d39754840a6ae8752b9c02bdcedf
Bytes: 47.00 Kb
 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: NOSTRA, Virginia, United States
 
Record
SN01718166-W 20081214/081212215426-848ffcae7e811ee8d4bbd5477151d3e8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.