Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 24, 2008 FBO #2463
SOLICITATION NOTICE

Y -- WY HPP 4-1(5), Beartooth Highway Rehabilitation and Reconstruction

Notice Date
8/22/2008
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-08-B-00023
 
Response Due
10/15/2008
 
Archive Date
12/25/2008
 
Point of Contact
Brenda J McGehee,, , Tiffany C Atchison,, Phone: 720-963-3354
 
E-Mail Address
brenda.mcgehee@fhwa.dot.gov, tiffany.atchison@fhwa.dot.gov
 
Small Business Set-Aside
N/A
 
Description
PROJECT DETAILS: The base schedule for this project will consist of full depth recycle with a 2-inches of hot asphalt concrete pavement, cleaning CMP and ditches, replacement of CMP, and replacement of guardrail on 11.3 miles. There are three optional schedules: (1) Option X – spot overlay, spot recycle/overlay, patching, crack sealing, underdrain, clean CMP and ditches, and replacement of CMP on 6.6 miles; (2) Option Y – remove and replace concrete bridge with 0.6 mile roadway approaches on new location in wetland areas; and (3) Option Z – 1-inch of additional overlay of hot asphalt concrete pavement on Schedule A. The projects begins at approximately Mile Post 24.5 just west of Clay Butte Lookout access road and ends at Mile Post 43.1 at the Wyoming/Montana State line. The 11.3 miles of the base schedule is over Beartooth Pass, beginning at Mile Post 31.8 just east of Long Lake Bridge and ends at Mile Post 43.1 at the Wyoming/Montana State line. The Bridge replace is at Little Bear Creek, immediately west of the Top of the World Store. Estimated price range for the base schedule and all three options is between $10,000,000 and $15,000,000. The principal work items on the base schedule include: lump sum contractor testing; lump sum construction schedule; removal of 3,100 m of fence; 4,000 m3 of subexcavation; 4,000 m3 of select topping; 30.000 km of shoulder reconditioning; 1,800 m of ditch reconditioning; 115,000 m2 of pulverizing (150 mm depth); 17,000 tons of superpave pavement; 185 tons of prime coast; 420 m2 of asphalt paved ditches; 4,000 hrs of temporary traffic control (flagger); along with associated survey and staking, soil erosion control, pipe culvert, special labor, pavement markings, and traffic control equipment. Tentative advertisement date is September 9, 2008. PLEASE NOTE: The Invitation for Bid (IFB) will not be available until September 9, 2008. On that date, the IFB may be downloaded from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL ONLY BE AVAILABLE ELECTRONICALLY ON THE CFLHD WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm Technical questions specific to the project will not be addressed by FHWA until the project is officially advertised.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=b672911fd2d893dc2cd24a5cde004d56&tab=core&_cview=1)
 
Place of Performance
Address: Shoshone National Forest, 808 Meadowlane Avenue, Cody, Wyoming, 82414, United States
Zip Code: 82414
 
Record
SN01648283-W 20080824/080822221518-b672911fd2d893dc2cd24a5cde004d56 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.