SOURCES SOUGHT

Y -- Design-Build Contract for waterfront structures improvements at Plum Island Harbor and maintenance dredging at Plum Island Harbor and Orient Point Harbor, New York.

Notice Date
3/18/2008
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US Army Engineer District, New York, CENAN-CT, 26 Federal Plaza, New York, NY 10278-0090
 
ZIP Code
10278-0090
 
Solicitation Number
W912DS-08-S-0010
 
Response Due
4/1/2008
 
Archive Date
5/31/2008
 
Point of Contact
Tshura Jones, 9177908081
 
E-Mail Address
Email your questions to US Army Engineer District, New York
(tshura.d.jones@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Design-Build Contract for waterfront structures improvements at Plum Island Harbor and maintenance dredging at Plum Island Harbor and Orient Point Harbor, New York. This is a SOURCES SOUGHT NOTICE for a Market Analysis ONLY to determine the availability of potential small business categories, for potential small business set-aside. NO AWARD will be made from this Sources Sought. NO SOLICITATION IS AVAILABLE AT THIS TIME; therefore, do NOT request a copy of a solicitation. Potential offerors h aving the skill, capabilities and bonding necessary to perform the described project are invited to perform feedback via email at Tshura.D.Jones@usace.army.mil. All responses will be used to determine the appropriate acquisition strategy for a potential fu ture acquisition. Particularly, the purpose of this NOTICE is to gain knowledge of potential small business sources in the following categories: certified 8a, certified HUB Zone, and Service-Disabled Veteran-Owned Small Business SDVOSB, for a Desi gn Build DB contract for waterfront improvements at Plum Island Harbor and maintenance dredging at Plum Island Harbor and Orient Point Harbor, New York. The NAICS Code is 237990 size standard $31.0 million average annual receipts for preceding three fiscal years. In potentially setting aside a future procurement, small businesses categories above MAY CONSIDER potential Joint Venture partners, Teaming partners, and or major subcontractor or prime. Such capabilities will be evaluated solely for the purpose of determining whether to Set-Aside for the Small Business Community OR to conduct as an UNRESTRICTED Procurement. LARGE BUSINESSES may respond to this NOTICE in the event the market does not indicate SB interest, however, preference will be given to the SB categories listed above. The estimated construction cost is between 3 million dollars to 5 million dollars. The intent is for the bulkhead to work to be accomplished first and the dredging IAW the environmental window. No awards will be made from the resp onses to this sources sought. No solicitation is available at this time. Responses will be used to determine appropriate acquisition decisions for a future procurement. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT Plum Island Anim al Disease Center PIADC requires improvement of portions of the waterfront structures at Plum Island Harbor the harbor or harbor, the primary receiving location for waterborne personnel, equipment, materials and other deliveries. This work also includes pe rforming maintenance dredging of the Plum Island Harbor and Orient Harbor. Since the PIADC harbor has limited space, this work is to be awarded as one contract in order to minimize disruption to the normal operations to PIADC. It is intended that the Bulk head work would comprise the base work and the maintenance dredging would be contract options The waterfront structures work consists of installing about 180 linear feet of steel sheet bulkhead along the northwest side of the harbor. The project area ex tends from the end of the harbor's west entrance channel jetty to the beginning of a steel sheet pile bulkhead adjacent to one of the ferry ramps. The work includes installing steel sheeting in front of an existing intake house without blocking the existin g intake), replacing an existing sediment control structure attached to the bulkhead, and the possible removal of an existing concrete retaining wall and substructure. About 80 percent of the design work has been completed in-house. The remaining portion o f the design requires that substantial field data be collected. The collection of this field data will be the responsibility of the DB offeror who will incorporate the findings of the field data collection effort into the DB effort. The maintenance dre dging work to be performed under this project consists of providing the labor, equipment, and materials to perform maintenance dredging of Plum Island Harbor an d Orient Harbor with placement of the dredged material in a protective dune along the beach at Plum Island and in various upland disposal areas for both Plum Island Harbor and Orient Harbor, Suffolk County, New York as shown on the Contract Documents prepa red by US Army Corps of Engineers, New York District. The work includes the maintenance dredging of approximately 28,865 cubic yards of material to the required dredging depths plus overdepth in Plum Island Harbor, and 16,920 cubic yards of material in Or ient Harbor. At Plum Island Harbor, 21,700 cubic yards are available in Area 1 which is to be dredged to 16 feet below MLW with 2' overdepth and 7,165 cubic yards in Area 2 which is to be dredged to 12' below MLW + 2 feet overdepth. The material dredged fr om Plum Island Harbor is to be placed on the shoreline and as a dune, with all remaining material to be placed in upland diked disposal areas. The work at Plum Island may include installation of a geotube core within the dune cross-section for approximatel y 600 LF. The material dredged from Orient Harbor is to be placed in an upland diked disposal area, and transferred to Orient Point and to an unknown upland disposal area. Due to environmental restrictions, dredging will not be permitted from January 15 un til September 30. PIADC is a restricted area requiring advance clearance of any contractor personnel. PIADC provides specific documentation to visitors: A Visitor Application, Special Requirements for Contractors Performing Work at Plum Island Animal Di sease Center and Approval of Foreign Visitor (for permanent-resident, non-US citizens, employed by the contractor will be required. This documentation is to be completed and submitted to PIADC at least three days prior to any visits by U.S. citizens and po ssibly a month prior to any visits by non-U.S. citizens. The estimated construction cost is between $2 million to 5 milllion dollars. SURVEY FOR THE CONSTRUCTION CONTRACTOR INDUSTRY The following is a survey questionnaire designed to appr ise the US Army Corps of Engineers, NY District, of any prospective construction contractors project execution capabilities. Please provide your response to the following questions. General 1) Have you ever worked on a design build contract fo r the construction of bulkheads similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number OR do you have the potential to do so? If so, submit explain your pot ential business strategy in performing the work. 2) Have you ever worked on maintenance dredging contracts similar in nature to this project? If so, please describe the project and for whom the work was performed OR do you have the potential to do so? If so, submit explain your potential business strategy in performing the work. Identify a point of contact and phone number. 3) Have you ever installed geotubes similar in nature to this project? If so, please describe the project and for wh om the work was performed OR do you have the potential to do so? If so, submit explain your potential business strategy in performing the work. Identify a point of contact and phone number. 4) Do you have the capacity to shape dredged material in to a dune and berm in the disposal area? 5) Would you be willing to bid on the project described in this synopsis? If the answer is No, please explain why not? 6) Is there a dollar limit on the size contract that you would bid? 7) Wha t are the largest maintenance dredging contracts (in dollar amounts) on which you were the prime contractor OR sub-contractor and your role? 8) What are the largest bulkhead contracts (in dollar amounts) on which you were the prime contractor OR sub contractor and your role? 9) What is your bonding capacity per contract? What is your total bonding capacity? 10) Would you be willing to perform the dredging work during the night shift ? 11) Is your company a small or large business as defined by the SBA? Are you classified as a certified 8a, certified HUB Zone, or Service-Disabled Veteran-Owned Small Business SDVOSB? Equipment < BR>13) Do you have access to a hydraulic dredge, capable of pumping dredged material 3,000 feet and dredging cobble and gravel.Identify which dredges, including support equipment tug, barge pump-out buoy, pipeline, etc. you would employ. 14) How wo uld you plan to transport equipment and materials to Plum Island? Any additional comments Please note that this notice is not a commitment on the part of the Government to award a contract as a result of this notice or to pay for any informat ion received. This announcement neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. Submit Survey Questionnaires to: Attn: SGT Tshura Jones, CENAN CT, Rm. 184 3, US Army Corps of Engineers, NY District, 26 Federal Plaza, New York, NY, 10278
 
Place of Performance
Address: US Army Engineer District, New York CENAN-CT, 26 Federal Plaza, New York NY
Zip Code: 10278-0090
Country: US
 
Record
SN01535401-W 20080320/080318224725 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)