MODIFICATION

J -- PERLITE REMOVAL FROM LIQUID HYDROGEN TANK V-133-LH

Notice Date
2/11/2008
 
Notice Type
Modification
 
NAICS
562998 — All Other Miscellaneous Waste Management Services
 
Contracting Office
NASA Business Management Division, Acquisition Management Office, Code BA30, Stennis Space Center, MS 39529-6000
 
ZIP Code
39529-6000
 
Solicitation Number
NNS08228430Q
 
Response Due
2/13/2008
 
Archive Date
2/11/2009
 
Point of Contact
James E Jacobs, Contract Specialist, Phone 228-688-3931, Fax 228-688-1141, Email James.E.Jacobs@nasa.gov - James D. Huk, Contracting Officer, Phone 228-688-1045, Fax 228-688-1141, Email james.huk@ssc.nasa.gov
 
E-Mail Address
Email your questions to James E Jacobs
(James.E.Jacobs@nasa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
This is a modification to the synopsis entitled Perlite Removal From Liquid Hydrogen Tank V-133-LH, SOLICITATION NO.NNS08228430Q which was posted on January 4, 2008. The purpose of this modification is to provide responses to the Vendor questions: The questions and responses are as follows: Question 1. Lock-out/tag - out procedures ? hot work, etc. Answer: All required safety lock-out/tag-out operations, flame permits and atmosphere sniff checks will be performed by NASA?s NTOG or FOS Contractor safety personnel. Question 2. Verify hours of operations. Answer: Normal operating hours are 7:00 am to 3:30 pm, Monday through Friday. Question 3. Any preferred waste management practices or vendors for disposal of the perlite? Answer: Disposal of all perlite and other waste material is the responsibility of the vendor. Transportation and off-site disposal is the responsibility of the vendor. Question 4. Any required training from say Safety Council, etc Answer: Viewing of a 30 minute safety video is required of all personnel working in the E test complex Question 5. Should tank need to be accessed by cutting, etc, what are the recert criteria, who is responsible, etc and subcontract requirements? Answer: NASA/SSC FOS Contractor will provide any cutting, welding, and subsequent inspection on the tank that may be necessary for the perlite removal. Question 6. Are side window cuts allowed into tank to vacuum perlite? Answer: Yes, see (5) above Question 7. If window cuts are allowed, what welding specifications and criteria are needed for closure? Answer: Welding must meet the requirements of ASME Boiler & Pressure Vessel Code, Sections VIII and IX. The due date for responses is not extended. Documents related to this procurement will be available over the Internet. These documents will reside on a World Wide Web (WWW) server, which may be accessed using a WWW browser application. The Internet site, or URL, for the NASA/SSC Business Opportunities home page is http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=64 Offerors are responsible for monitoring this site for the release of the solicitation and any amendments. Potential offerors are responsible for downloading their own copy of the solicitation and amendments (if any). [INSERT ANY APPLICABLE NOTES]
 
Web Link
http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=64#128309
 
Record
SN01505945-W 20080213/080211230232 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.