Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 22, 2007 FBO #2217
MODIFICATION

36 -- TEST CHAMBERS

Notice Date
12/20/2007
 
Notice Type
Modification
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
ACA, Aberdeen Proving Ground, Directorate of Contracting, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013
 
ZIP Code
21005-3013
 
Solicitation Number
W91ZLK-08-T-0083
 
Response Due
12/27/2007
 
Archive Date
2/25/2008
 
Point of Contact
Susan Sowa, 410-278-0771
 
E-Mail Address
ACA, Aberdeen Proving Ground
(susan.sowa@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
AMENDMENT 0003 IS ISSUED TO PROVIDE ANSWERS TO ADDITIONAL QUESTIONS. THE CLOSING DATE OF THE SOLICITATION REMAINS UNCHANGED AT DECEMBER 27, 2007, 2:00 PM EASTERN STANDARD TIME. Quotations must be signed, dated, and received by the closing date and ti me, via fax at 410-306-3726 or email at susan.sowa@us.army.mil at the US Army Contracting Agency, Directorate of Contracting, Attention: SFCA-NR-APC-T, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013. For questions concerning this Request for Quotations contact Susan Sowa Contracting Specialist @ (410) 278-0771 or email susan.sowa@us.army.mil or Mr. Robin Donovan (410) 278-0876 or email robin.donovan@us.army.mil. Please SUBMIT YOUR QUOTATIONS to Ms. Sowa via email to: susan.sowa@us.army.m il or Fax 410-306-3726. Note the following change in the W91ZLK-08-T-0083 Specifications: Revise hazardous location classifications to Class 1, Group C, D, and Class II, Group E, F, G, Division 2 for conditioned chamber area wiring specifications. QUES TIONS AND ANSWERS ARE AS FOLLOWS CLIN 0001: QUESTION 6: The Cargocaire HC-300 would have to be XP as well, air would be circulated through it from inside the chamber. We are checking in to this on our end but wondered if this was taken in to consideration and if you had experience buying XP Cargocaire units in this model? Answer: The air drier does not need to be explosion proof. The HC-300 is located in mechanical area of chamber. To make clear the safety specifications of the chamber, please be advise of the following: 1. Any openings in the wall between the conditioned chamber area and the mechanical equipment area shall be sealed so that no conditioned air may leak into the mechanical area. Openings in this wall must be sealed from both sides. 2. The ex plosion proof interior light fixtures apply only to the conditioned chamber area. 3. Regarding the seven 120V, 20A duplex receptacles, three will be located in the mechanical equipment area and four will be located on the exterior walls of the conditioned chamber area. The four receptacles shall be located near the access ports. All receptacles shall be clear of any door swing areas/clearances. 4. Revise hazardous location classifications to Class 1, Group C, D, and Class II, Group E, F, G, Division 2 for c onditioned chamber area wiring. QUESTION 7: How large do the bi-parting doors need to be? Answer: The bi-parting doors should open up to allow full access to the interior conditioned space, 94 wide x 122 deep x 83 high. QUESTION 8: A 15x15 Cascade refr igeration system (as specified) will not transition this size chamber from 180?F to -80?F in 120 minutes with a 3000 lb load of steel especially with 3/16 th plate in the bottom of the chamber for the floor. Answer: We are requesting the 15hp refrigeration system. Three hours will be sufficient for the temperature/load limits. QUESTION 9: I do not see a mention to blow out panels which would be typical on this type of chamber? Answer: The chamber does require blow out panels. QUESTION 10: Requirement for d efrost? Do you plan on soaking at a low temperature for a prolonged period of time? Answer: A defrosts system is being requested. The chamber could soak at low temperatures for as long as a month. Sometimes it may only run for a week. However, people may enter the chamber on humid days bringing moisture into the air. QUESTION 11: Can we quote our standard control system or is the Micristar controls system a must? Answer: The Micristar control system is a must. QUESTION 12: Is a Modular panel room ok? Answ er: If referring to the chamber wall construction, it must be well sealed. The chamber will not be moved once installed. However, leakage can be a problem so any short cuts in the chamber wall construction could mean a large loss of quality for the chamber in its future. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (20-DEC-2007); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/USA/DABJ/DABJ05/W91ZLK-08-T-0083/listing.html)
 
Place of Performance
Address: ACA, Aberdeen Proving Ground Directorate of Contracting, 4118 Susquehanna Avenue Aberdeen Proving Ground MD
Zip Code: 21005-3013
Country: US
 
Record
SN01474772-F 20071222/071220233429 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.