Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 18, 2007 FBO #2183
SOLICITATION NOTICE

10 -- Manufacture of Electric Control Box (Loader's Weapon Control Panel) for the M102, 105 MM Aircraft Cannon

Notice Date
11/16/2007
 
Notice Type
Solicitation Notice
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, WR-ALC, WR-ALC/PK Acquisition Opportunities 235 Byron St,, Warner Robins, GA, 31098-1611, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
FA8520-08-R-10090
 
Response Due
1/5/2008
 
Archive Date
12/31/2008
 
Point of Contact
Robert Anderson, Contract Specialist, Phone (478)327-4843, Fax (478)926-9108, - Robert Anderson, Contract Specialist, Phone (478)327-4843, Fax (478)926-9108
 
E-Mail Address
Robert.Anderson@robins.af.mil, Robert.Anderson@robins.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
This acquisition is 100% Set-Aside for Small Business. This requirement is for a five year (one year basic and four one year optional ordering periods), firm fixed price, Indefinite Delivery Indefinite Quantity (IDIQ) contract for the manufacture of the Electrical Control Box (Loader's Weapon Control Panel) used to provide mode selection and control for the 105MM M102 aircraft cannon used on AC-130 aircraft. Positioning of the mode selector controls the condition of relays routing input signals and power to circuits throughout the 105MM armament system. NSN 1015-01-337-4633GG; P/N 9282611-10; DIM 12 in. height X 13 in. width X 5 in. deep and weighing approx. 20 lbs.; MAT predominantly steel with circuit breakers, wiring harness, relays and circuit boards. Quantities required are 1 ea. first article and 1-15 ea. production articles for the basic ordering period. Quantities for each of the four optional periods are 1-5 ea. The first article requirement will not be waived. First article will be both contractor (test plan and report required) and Government tested. First article delivery is NLT 180 DARO contract award delivered F.O.B. Destination to Hurlburt Field, FL. Production articles to be delivered NLT 180 DARO approved first article F.O.B. Origin to Robins AFB GA. Approximate solicitation issue date is 3 DEC 2007 with an approximate response date of 5 JAN 2008. Solicitation will be available for viewing or downloading from the www.fbo.gov website only. NOTE 1 Applies.
 
Record
SN01453927-W 20071118/071116231002 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.