SOLICITATION NOTICE
J -- PROVIDE AN ENVIRONMENTAL CONTAINMENT 85 FT X 340 FT (FOR NONSKID WORK) ON USS HARRY S. TRUMAN (CVN-75)
- Notice Date
- 8/21/2007
- Notice Type
- Solicitation Notice
- Contracting Office
- N40025 PO Box 215 Building 51, 2nd Floor Portsmouth, VA
- ZIP Code
- 00000
- Solicitation Number
- N4002507Q0016
- Response Due
- 9/5/2007
- Archive Date
- 10/5/2007
- Description
- A. The containment enclosure structure must be modular in design and configurable if necessary. B. It should be easily movable using small forklifts and / or manpower without breakdown and set-up delays. C. It must be constructed of light weight fire resistant materials and be designed to distribute the load over the covered area and to protect the new coating from damage. The total weight of the system must allow for a maximum point load of 1600lbs/sqft. Pneumatic wheels are an option and must be soft enough to prevent damage to the new non-skid. D. Structure must be capable of spanning up to 75 feet wide by 330 feet long without internal support.(internal deck areas must be unobstructed) E. Structure and containment fabric must be capable of withstanding 70 mph winds. F. Containment fabric must be easily repairable. G. Containment fabric must be sealable and capable of containing, and excluding pollutants, and providing a controlled environment in accordance with NSTM Chapter 634, table 634-3-6. H. The enclosure must include an integral watertight seal around the base, capable of conforming to the deck and excluding all water from the work areas. I. Illumination inside the containment shall be a minimum of 50 foot candle power at the working surface. J. Air exchange, as a minimum of 4 complete exchanges per hour. 2. Contractor will be self sufficient. Use of pier shore power is an option, if it is available, otherwise the contractor shall provide generators. 3. Contractor will be required to construct and set required environmental conditions of the enclosure initially over the landing area, plus two moves will be utilized as directed by the SUPERVISOR to accomplish the task of 55,000 square feet of landing area non-skid replacement.
- Record
- SN01380063-W 20070823/070822071302 (fbodaily.com)