Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 13, 2007 FBO #2055
SOLICITATION NOTICE

Y -- Wetland Restoration Projects (Altoona Area Office)

Notice Date
7/11/2007
 
Notice Type
Solicitation Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Natural Resources Conservation Service, Wisconsin State Office, 8030 Excelsior Drive, Suite 200, Madison, WI, 53717, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
AG-5F48-S-07-0007
 
Response Due
8/27/2007
 
Archive Date
9/11/2007
 
Description
Heavy Construction - Wetland Restoration Projects (4) Four Sites Dunn, Eau Claire and Trempealeau Counties, Wisconsin Project #1 ? Jerome Bauer, WRP Restoration WRP Project #66-5F48-5-026 Township: Rock Creek (Rock Falls, WI) Zip Code: 54764 Dunn County Wisconsin Practices: Site Prep (includes stripping), Spillway, Tree Removal, Fencing, and Seeding Project involves the construction of an 1156 foot embankment with wave berm on prior cropland with spillway 425 feet in length. Also included will be micro-topography excavations within the pool area, tree removal and tree trunks relocated in the pool area for habitat improvement, fencing, and seeding of constructed practices with specified seed mix. Performance: 18 days on-site (assuming 3 pieces of heavy equipment) Project #2 ? Marifke WRP Restoration Wetland Reserve Program (WRP) Reference No. 66-5F48-5-024 Township: Bridge Creek (Augusta, WI) Zip code: 54722 Eau Claire County Wisconsin Practices: Site Access/Site Prep, Ditch Plug, and Seeding Project involves gaining access to the construction site through a wooded area and constructing a shallow wildlife scrape irregular in shape .50 to .75 acre in size with varied bottom depths up to 3 feet. Excavated spoil from scrape will be removed and spread in a specific location. Also the placement of larger tree trunks in the scrape area for habitat improvement and the seeding of disturbed access road and spoil site with a specified seed mix. Performance: 7 days on-site (assuming 2 pieces of equipment) Seeding Application Window: August 1st thru 21st or November 1 thru Snow Cover Project #3 - Rouleau WRP Restoration Wetland Reserve Program (WRP) Reference No. 66-5F48-5-025 Township: Bridge Creek (Augusta, WI) Zip code: 54722 Eau Claire County Wisconsin Practices: Site Access/Site Prep, Ditch Plug, and Seeding Project involves gaining access to the construction site through a wooded area and the filling of a 150 feet (ditch plug) of an existing ditch with suitable soils designated from a nearby borrow location. Also tree removal and the placement of larger tree trunks for habitat improvement, the seeding of disturbed access road, borrow site, and ditch plug with a specified seed mix. Performance: 7 days on-site (assuming 2 pieces of equipment) Seeding Application Window: August 1st thru 21st or November 1 thru Snow Cover Project #4 ? Schaefer WRP Restoration Wetland Reserve Program (WRP) Reference No. 66-5F48-5-061 Township: Lincoln (Whitehall, WI) Zip code: 54773 Trempealeau County Wisconsin Practices: Site Prep/Debris Removal, Stripping, Earth Fill, PVC Pipe, Inline Water Control, Anti-Seep Collars, Rodent Guards, Grass Spillways, Benchmark, Tile Removal, and Seeding. Project involves the construction of 2 embankments with a wave berm, 858 feet and 927 feet in length on prior cropland consisting of silt loam soils with spillways 240 and 190 feet in length. Installations of 2 inline PVC water control units, anti-seep collars and rodent guards. Project also includes the breaking of 5 specific existing tile lines. Tree and debris removal and placement for habitat improvement and the seeding of constructed practices and upland areas with specified seed mixes. Performance: 21 days on-site (assuming four pieces of equipment) Seeding Application Window: August 1st thru 21st or November 1 thru Snow Cover GENERAL PROJECT NOTES: Project Plans will be posted with full solicitation (on or about July 26th)! Pre-proposal meeting will be August 3, 2007 at 10:30 AM at; USDA NRCS, Altoona Area Office 1304 N Hillcrest Pkwy, Suite A (Conference Room) Altoona, WI 54720 These are federal construction projects, Davis-Bacon Wage Rates will apply to work under any resultant contract. These projects may be completed in any order ? however, NRCS must approve schedules and give official Notice to Proceed prior to start of work at each site. All work, including permanent seeding must be completed no later than November 15, 2007. Estimated 53 calendar days to complete on-site work, assuming five 10-hour workdays, excluding federal holidays and weekends and considering equipment on-site as described above. Performance period will be; Date of Award thru November 15, 2007. Range of Construction: $40,000 to $60,000 (total for all four projects)
 
Place of Performance
Address: Dunn, Eau Claire, and Trempealeau Counties, Wisconsin
Zip Code: 54720
Country: UNITED STATES
 
Record
SN01339110-W 20070713/070711220612 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.