Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 05, 2007 FBO #2047
SOLICITATION NOTICE

Z -- Repair Elk River Dam

Notice Date
7/3/2007
 
Notice Type
Solicitation Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AEDC - Arnold Engineering Development Center, 100 Kindel Drive, Suite A-335, Arnold AFB, TN, 37389-1335, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
FA9101-07-B-0006
 
Archive Date
9/15/2007
 
Description
Repair Elk River Dam at Arnold AFB, TN--The work shall be accomplished in three phases. Phase I consists of painting Gate 1 of the dam and associated work. Phase 2 consists of providing a new sluice gate bulkhead and rehabbing the existing sluice gates, sluice gate hoists, bonnets, and embedded frames as well as replacing existing hydraulic pumps, piping, and electrical controls. Phase 3 will consist of replacing existing tainter gate motors, controllers, control system, gate chains and sprockets, and various electrical equipment. The performance period will be 180 calendar days for each phase, which may or may not run concurrently. The total estimated magnitude of work for all three phases is between $1,000,000 and $5,000,000.
 
Place of Performance
Address: Building 3101, Arnold AFB, TN
Zip Code: 37389
Country: UNITED STATES
 
Record
SN01333883-W 20070705/070703220900 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.