MODIFICATION

72 -- Commercial Laundry Equipment

Notice Date
6/15/2007
 
Notice Type
Modification
 
NAICS
333312 — Commercial Laundry, Drycleaning, and Pressing Machine Manufacturing
 
Contracting Office
Department of Homeland Security, Federal Law Enforcement Training Center (FLETC), FLETC Artesia Facility (OAO), 1300 W. Richey, Artesia, NM, 88210, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
Reference-Number-07ART0230
 
Response Due
6/29/2007
 
Small Business Set-Aside
Total Small Business
 
Description
This combined synopsis/solicitation is hereby amended to extend the Response Date to NLT 4:30 p.m. on June 29, 2007 and to provide answers to offerors questions. Any additional questions are to be submitted in writing to Cynthia Ybarra, FLETC, 1300 W. Richey, Bldg. 4, Artesia, NM 88210, by facsimile to 505-748-8002 (Attn: Cynthia Ybarra), or by email to cynthia.ybarra@dhs.gov NLT 4:30 p.m. on June 22, 2007. Written replies to questions will be provided as an amendment to this combined synopsis/solicitation. What are the Electrical connections for the washers and dryers: 1. The equipment electrical service can be either 200 or 400 voltage 3 phase service. Answer: Washers (20 Amps) 3-Phase @ 480VAC, and Dryers (30 Amps) 3-Phase @ 480VAC. 2. Facility provides the electrical service boxes for the equipment to be connected to? Answer: YES Washer Water Connections: 1. Washers will be shipped with 1 inch water hoses, for connection to 1 inch water line service provided by facility. Each connection needs a shutoff valve for isolation between washer and water feed connection. Answer: Building Hot and Cold Water branch service supply lines remains 3/4 inch NPT with isolation valves. Washer Drain too? 1. Do the washers drain to a pit/drain trough or into a sewer line. Answer: Drain Through 2. If sewer line what size and capacity flow of this line? Answer: N/A Dryers: 1. Gas type Natural Gas or LP-Gas pipe connection required 1 inch. Answer: Natural Gas branch line remains 3/4 inch. 2. Connection Exhaust duct work for dryers should be all individual 12 inch either through wall or roof. Who is performing this work in connecting exhaust duct work to outside. Answer: Vent is 12 inch, and final connection to building exhaust system shall be provided by equipment supplier. 3. Duct work proposal would only be to connect dryer to interior duct work in facility. If additional work would be needed I would need to be sent drawings for exhaust system pertaining to the dryers. Answer: See last comment. Special Note on Dryers: I notice that in the bid proposal there was no mention of fire protection for the dryers. While there is an additional cost for this feature it requires a water connection and internal changes in the dryer connections. Since all the recent Government Contracts for dryers have required that addition could you let me know if I have to add this to the dryer equipment? Answer: Not Required. All other terms and conditions of the original combined synopsis/solicitation remain the same.
 
Place of Performance
Address: Federal Law Enforcement Training Center, 1300 W. Richey Avenue, Artesia, NM
Zip Code: 88210
Country: UNITED STATES
 
Record
SN01319974-W 20070617/070615220632 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.