Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 23, 2007 FBO #2004
MODIFICATION

80 -- GYM FLOORS

Notice Date
5/21/2007
 
Notice Type
Modification
 
NAICS
238330 — Flooring Contractors
 
Contracting Office
ACA, Yuma Proving Ground - DABK41, ATTN: SFCA-SR-YM, Directorate of Contracting, Buidling 2100, Ocotillo Street, Yuma, AZ 85365-9106
 
ZIP Code
85365-9106
 
Solicitation Number
W9124R-07-T-1068
 
Response Due
5/24/2007
 
Archive Date
7/23/2007
 
Point of Contact
Samuel Colton, 928-328-6354
 
E-Mail Address
ACA, Yuma Proving Ground - DABK41
(samuel.colton@yuma.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
This amendment is issued to answer questions submitted. Q1. What is the color of the gym floor? A1. The current gym floor is a yellowish or gold in color. The new floor for building 519 Addition shall be like and kind in color to that of the main gym floor. Color must be submitted for approval. Q2. What are the colors of the Lines? A2. Blue is the color on the main court for basketball. White is the color for the volley ball court. Gray is the color for the side basketball court. Color must be submitted for approval. Q3. Where is the staging area for the contractor located as far as the distance from the job site? A3. The staging area will be coordinated with the contractor who is awarded the contract. The location of the staging area from the job site will depend on the amount of space required by the contractor. Q4. Is there material that must be removed by the contractor? Such as the old floors? If so then this will need to be added to the solicitation. A4. Building 519 Additional is a new building and does not have any flooring material other than a concrete floor. The main gym floor currently has a synthetic type floor which shall be resurfaced. It is our understanding that there are two ways to perfor m the task. One is to remove the current flooring material and install the new material. The other is to pour the new material over the old. In the past the flooring material was removed and the new material put in place. Q5. Will the work area be accessible all day or only at night and weekends? A5. Currently the installation is on a 4-day workweek schedule. The hours of operation are 6:30 a.m. to 5:00 p.m. MST, Monday through Thursday, excluding legal public holidays. On request, the contractor may be authorized to work weekends and other than c onventional work shifts. Q6. What is the time frame for completion? A6. Currently the main gym floor is ready for work to be performed. Work must be completed within 30 days of award. The additional is under construction and will not be available until the end of June. Completion of the floor for the addition shall be wi thin 30 days from date of availability. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (21-MAY-2007); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/USA/DABK/DABK41/W9124R-07-T-1068/listing.html)
 
Place of Performance
Address: ACA, Yuma Proving Ground - DABK41 ATTN: SFCA-SR-YM, Directorate of Contracting, Buidling 2100, Ocotillo Street Yuma AZ
Zip Code: 85365-9106
Country: US
 
Record
SN01299971-F 20070523/070522001240 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.