Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 20, 2007 FBO #1971
MODIFICATION

70 -- CCTV Purchase, Installation and Maintenance

Notice Date
4/17/2007
 
Notice Type
Modification
 
NAICS
423690 — Other Electronic Parts and Equipment Merchant Wholesalers
 
Contracting Office
Department of Labor, Office of the Assistant Secretary for Administration and Management, Procurement Services Center, S-4306 200 Constitution Avenue, NW, Washington, DC, 20210-0001, UNITED STATES
 
ZIP Code
20210-0001
 
Solicitation Number
DOLPR155131-1
 
Response Due
11/13/2006
 
Point of Contact
Ronald Jordan, Contracting Officer, Phone 202-693-4595, Fax 202-693-4579, - Ronald Jordan, Contracting Officer, Phone 202-693-4595, Fax 202-693-4579,
 
E-Mail Address
jordan.ronald@dol.gov, jordan.ronald@dol.gov
 
Description
This amendment number 0002 is hereby issued to: I) announce a site visit. A site visit will be held on Friday, April 13, 2007 at 11:00 am, EST. The address of the site visit will be: U.S. Department of Labor, Frances Perkins Building, 200 Constitution Ave, NW, Washington DC, 20210. The site visit will be conducted by Mr. Robert Rouse. Mr. Rouse will meet all attendees of the site visit at the 3rd Street Entrance into DOL at 11:00 am. II) include a deadline for the submission of questions. All questions regarding this requirement must be submitted via email to jordan.ronald@dol.gov. All questions must be submitted no later than 5:00 pm, EST on Friday, April 13, 2007. Questions received after the due date will not be answered. Answers to questions received will be posted via amendment to the solicitation by Tuesday April 17, 2007. III) extend the deadline for the submission of quotes. The due date for all quotes is hereby extended until 3:00 pm, EST, Thursday, April 19, 2007. Quotes received after the due date will not be considered. some type of video monitor? ANSWER: These are existing locations, and have new monitors at them. 15. In regard to training, how many users will have to be trained in total? You have asked for at least two days of training for each level of user. How many levels of users are there and how do you define these user levels? ANSWER: User and Administrator 16. On Maintenance and Support, do you want the bid to include a price for a second option year of coverage or prices for both second and third optional years of coverage? ANSWER: Second and Third 17. Regarding "Other CCTV Equipment (Loading Dock)", what types of cameras will be connected to the new 160GB 9 port Digital Video Recorder you have requested? Are they fixed-position or PTZ units and what is the brand name? ANSWER: All standard fixed 18. Do you need furniture and racks for the User Stations with joysticks? Do you have existing LCD screens? ANSWER: All is provided by DOL 19. The solicitation refers to "High quality images". Can you provide specifications for this? A 240 resolution is technically high, but there are 480, 2 CIF, 4 CIF, and others. ANSWER: See Question 2 answer. 20. The solicitation references a Handheld PC. Can you provide specifications for the types of Handheld PCs (such as Windows CE devices, Windows Mobile devices or Palm devices, or Smart Phones, etc.)? ANSWER: Windows CE devices, Windows Mobile devices, or Palm devices. 21. Is power over Ethernet viable in the solution? ANSWER: No 21. Do you want vendors to provide recording for 64 cameras or for the 20 total cameras with capabilities of up to 64 in the future? ANSWER: You must provide for the recording of 64 cameras for a period of no less than 30 days. 22. Do you want all exterior cameras to have the capability to switch to black & white low light conditions (known as day/night cameras)? The RFQ indicates color cameras which are less sensitive to low light conditions and less expensive than a day/night camera. ANSWER: See Question 2 answer 23. What horizontal resolution is required for color, 540 lines or 480 lines? The higher the resolution, the better the image. The higher resolution cameras are typically more expensive than the lower resolution camera. ANSWER: See Question 2 answer 24. Will the two (2) new interior PTZ cameras in the main lobby area be mounted on the wall or in the ceiling? If ceiling mounted, is the ceiling a drop ceiling or hard ceiling? ANSWER: Located in the ceiling. Ceiling is both a hard ceiling at camera location with access points the n transition to a drop for wire run. 25. What zoom capability do you require for the interior and exterior PTZ cameras? Zoom capability depends on the distance and quality of what you are trying to view. ANSWER: See Question 2 answer 26. You ask for environmental housing for some of the cameras. Do you have existing cabling in place to run the camera and the heater/blower in the environmental housings? ANSWER: Yes 27. What lux rating specification do you require for the low light Fixed cameras? ANSWER See Question 2 answer 28. Is there lighting in the vicinity of these Fixed cameras? ANSWER Minimal 29. How high are the existing cameras that are being replaced in the camera upgrade section? Do we need a special lift to replace these cameras or will commercial ladders suffice? ANSWER Reachable by ladder 30. What is the approximate distance between the command center and the newly installed interior PTZ cameras in the lobby? ANSWER Use 700ft as a range 31. Concerning the Camera Upgrade section of the solicitation, is there a separate (single pair) cable (in addition to the RG-59) available to control the fixed exterior cameras? ANSWER: Only power and RG-59. That is why control is required over the RG-59. 32. Concerning the Other CCTV Equipment section of the solicitation, what type of Government furnished power supplies are available? ANSWER: System was functional, put in new guard booth only needs to be mounted and connected. Just adding new monitor and DVR function. 33. How many Fixed IP addresses of the DSL will be provided for the DVRs? ANSWER: The only thing that the DSL line will be supporting is the DVRs attached to this system. 34. What is the bandwidth for the DSL? ANSWER Unknown 35. What is the size of the existing Hard drives in the DVRs? ANSWER Unknown 36. What is the maximum number of the PC users that are going to access the DVR? ANSWER No more than 15 37. Is there enough room to upgrade the matrix switcher to accommodate 16 more cameras? Is the Current Matrix Switcher capable of handling 16 extra cameras? ANSWER There is space to upgrade. It is unknown if the current system will accommodate 16 more cameras. 38. Will there be open invoices for emergency response? ANSWER This question is unclear and could not be answered NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (17-APR-2007). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 18-APR-2007, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/DOL/OASAM/WashingtonDC/DOLPR155131-1/listing.html)
 
Place of Performance
Address: 200 Constitution Avenue, NW Washington, DC
Zip Code: 20210-0001
Country: UNITED STATES
 
Record
SN01276510-F 20070420/070418224003 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.