Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 08, 2007 FBO #1928
SOLICITATION NOTICE

B -- Total Dissolved Gas Monitoring Program Albeni Falls Dam, Oldtown, ID Chief Joseph Dam, Bridgeport, WA Libby Dam, Libby, MT

Notice Date
3/6/2007
 
Notice Type
Solicitation Notice
 
NAICS
541360 — Geophysical Surveying and Mapping Services
 
Contracting Office
US Army Engineer District, Seattle, ATTN: CENWS-CT, PO Box 3755, Seattle, WA 98124-3755
 
ZIP Code
98124-3755
 
Solicitation Number
W912DW-07-Q-0034
 
Response Due
3/16/2007
 
Archive Date
5/15/2007
 
Small Business Set-Aside
Total Small Business
 
Description
Point of Contact is Patricia Ortiz, Purchasing Agent Phone 206-764-3516, Fax 206-764-6817 or email patricia.a.ortiz@usace.army.mil The contractor will install government owned and supplied Hydrolab MiniSonde total dissolved gas (TDG) probes at Chief Joseph Dam on the Columbia River, Libby Dam on the Kootenai River, and Albeni Falls Dam on the Pend Orielle River. The contractor will install two TDG probes at Chief Joseph Dam, one TDG probe at Libby Dam, and two TDG probes at Albeni Falls Dam by 1 April 2007. The contractor will maintain two additional TDG probes to be dedicated to Chief Joseph Dam, one additional TDG probe to be dedicated to Libby Dam, and two additional TDG probes to be dedicated to Albeni Falls Dam. The TDG probes will be maintained until 30 September 2007, after which time the Corps of Engineers will remove the probes. Task 2  Calibration and Maintenance The contractor will calibrate and maintain the TDG probes following the US Army Corps of Engineers Northwest Division (USACE-NWD) Data Quality Criteria protocol provided in Attachment A. The calibration and maintenance will include, but not be limited to, the following points. Calibration and maintenance will be performed on a two-week cycle. TDG probes will be rotated on a two-week cycle at each station. The extra TDG probe for each site will be lab calibrated before its rotation into the field. Once it is deployed, the probe will be field calibrated and checked as described in detail in A ttachment A. Laboratory calibration forms, field inspection forms, and field calibration logs will be completed during every field visit to the site, and will be provided to the Corps of Engineers within a week of each site visit. The contractor will prepare monthly calibration reports for all sites and provide them to the Corps of Engineers on a monthly basis. Task 3  Emergency Site Visits In the event that the TDG system exhibits problems, such as data are not updated, data are outside of acceptable parameters, no data available etc., the contractor will visit the site within forty eight (48) hours of the problem notification, and correct t he problem, if possible. In the event that real-time data reporting is not feasible, the contractor will work with the Corps to update the TDG database via post-processing of data. Task 4  Data Review The contractor will review the quality of the data to identify and deal with questionable data. The data review process will include visually looking at the tables of data, filling out a data quality checklist, flagging questionable data, and evaluating h ow to best deal with suspect data (either by correcting the data or by deleting the data), and post-processing of data. Task 5  Data Analysis and Reporting The contractor will provide the Corps of Engineers with a year-end water quality data report documenting the overall performance of the TDG probes with respect to data reliability, data quality, and data completeness. The contractor will follow USACE-NWD data quality assurance/quality control (QA/QC) protocols.
 
Place of Performance
Address: US Army Engineer District, Seattle ATTN: CENWS-CT, PO Box 3755 Seattle WA
Zip Code: 98124-3755
Country: US
 
Record
SN01244846-W 20070308/070306221259 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.