Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 28, 2007 FBO #1889
MODIFICATION

Z -- Landfill Face Stabilization, Phase A

Notice Date
1/26/2007
 
Notice Type
Modification
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Air Force, Air Force Space Command, Detachment 1, 21 CONS, U.S.Embassy PSC 73, APO AE, AE, 09716, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
FA2523-07-R-0002
 
Description
The scope of this project requires the contractor to furnish all supervision, plant, labor, materials, tools, and equipment to stabilize the sea coastal borders of a portion of a closed landfill. The work includes, but is not limited to: Repair of approximately 120 meters of coastal shoreline to prevent errosion and improve esthetic appearance. The work includes excavation and inspection for contamination of approximately 2900 cubic meters of excess soil from the seafloor and beachfront; installation of approximately 3700 square meters geotextile fabric with estimated 14,500 cubic meters basaltic rock coverage which the contractor will be required to blast, crush and transport from a nearby quarry; and some leveling and earthwork to the landfills themselves. The location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May or October. Additionally, Thule Air Base's location demands that all supplies/personnel must be shipped/transported in/out via air/sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The estimated magnitude of this project is between $500,000 and $1,000,000. This project is one of six separate and distinct phases of work, the first of which was completed in 2006. The performance period for this phase is 365 days. There is a 245 calendar day winter exclusionary period from 15 September to 15 May wherein no work will be permitted. This period is included in the total performance period. Actual construction is expected to take 60-90 days.Price-Performance Tradeoff (PPT) shall be used as the method of evaluation. It is anticipated the solicitation documents, including specifications and drawings, shall be posted electronically on or about 23 February 2007 with offers due 30 days thereafter. Any and all amendments shall be likewise posted. This solicitation and award is restricted in accordance with 10 U.S.C. 2304(c)(4) International Agreement, to US, Danish and Greenlandic firms. No hard-copies of the solicitation will be distributed. Offerors are required to be registered in the Central Contractor Registry (see www.ccr.gov). Point of Contact: Renee Carelli, Contract Administrator, Phone +45 33 41 74 68, Fax +45 35 26 51 08, Email renee.carelli@det1.dk, Kenneth E. Mackay, Contracting Officer, Phone +45 33 41 74 67, Fax +45 35 26 51 08, Email: kenneth.mackay@det1.dk.
 
Place of Performance
Address: Thule Air Base
Country: GREENLAND
 
Record
SN01220019-W 20070128/070126220753 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.